<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Kevin Flynn&#039;s Inside Lane &#187; I-70</title>
	<atom:link href="http://www.inside-lane.com/tag/i-70/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.inside-lane.com</link>
	<description>News and commentary about Colorado transportation</description>
	<lastBuildDate>Fri, 23 Apr 2010 15:04:54 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>CDOT: Traffic switch Wednesday in Glenwood Canyon rockfall repair construction zone</title>
		<link>http://www.inside-lane.com/2010/04/14/cdot-traffic-switch-wednesday-in-glenwood-canyon-rockfall-repair-construction-zone/</link>
		<comments>http://www.inside-lane.com/2010/04/14/cdot-traffic-switch-wednesday-in-glenwood-canyon-rockfall-repair-construction-zone/#comments</comments>
		<pubDate>Thu, 15 Apr 2010 03:43:37 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[Flatiron Construction]]></category>
		<category><![CDATA[Glenwood Canyon]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4747</guid>
		<description><![CDATA[The Colorado Department of Transportation and contractor Flatiron Construction will be switching eastbound traffic approaching the rockfall work zone tomorrow at 1 PM. At mile marker 125—about a half mile from the current work zone, eastbound traffic will be switched to the left (inside) lane to allow crews to make bridge deck repairs in the right lane.

Eastbound traffic will then shift back to the right lane just before Hanging Lake Tunnel, where both east- and westbound traffic utilize the eastbound lanes, separated by a concrete barrier. ]]></description>
			<content:encoded><![CDATA[<p><strong>CDOT Traffic Advisory</p>
<p>I-70 Glenwood Canyon Rockfall Project Update</p>
<p>Eastbound Traffic Switch Tomorrow:  Motorists Urged to Slow Down to the Posted 25 mph</strong></p>
<p>GLENWOOD CANYON – The Colorado Department of Transportation and contractor Flatiron Construction will be switching eastbound traffic approaching the rockfall work zone tomorrow at 1 PM. At mile marker 125—about a half mile from the current work zone, eastbound traffic will be switched to the left (inside) lane to allow crews to make bridge deck repairs in the right lane.</p>
<p>Eastbound traffic will then shift back to the right lane just before Hanging Lake Tunnel, where both east- and westbound traffic utilize the eastbound lanes, separated by a concrete barrier. </p>
<p>Through the entire traffic-switch section and work zone, the speed limit is reduced to 25 MPH and there is a 14-foot width restriction. Traffic will remain in this configuration until this deck work is completed. Thank you for going “Slow for the Cone Zone!”</p>
<p>While the Glenwood Canyon bike path should open sometime in April, the section between the Shoshone power plant and Hanging Lake rest area will remain closed for safety until the project is completed, which will be on or before May 15. </p>
<p>ROCKFALL INCIDENT INFORMATION:  Just after midnight on March 8, a large rockslide hit I-70 in Glenwood Canyon near mile marker 125, just west of Hanging Lake Tunnel. I-70 was closed in both directions to all traffic between Glenwood Springs (mm 116) and Dotsero (mm 133). The interstate reopened to a single lane of traffic in each direction on the afternoon of March 11.</p>
<p>The rockfall brought 20 boulders onto the interstate, ranging in size from 3 feet to10 feet in diameter. The largest weighed about 66 tons. The rocks made holes in the elevated sections of roadway—the largest being in the westbound lanes (closest to the hillside) and measuring 20 feet by 10 feet. Another hole in the lower eastbound lanes measured 6 feet by 6 feet. There were a half a dozen other holes and “dips” in the roadway, as well as areas where rocks were embedded. Most of these repair areas were approximately 5 feet by 5 feet. Rocks were scattered over 100 yards of roadway. Also damaged were three sections of steel guard rail and median barrier. </p>
<p>For information about other CDOT projects, the public may log on to <a href="http://www.coloradodot.info">www.coloradodot.info</a> or call 511. To receive information directly, log on to this web site and click the icon in upper right corner entitled &#8220;Sign up for Email and Wireless Alerts.&#8221; </p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/14/cdot-traffic-switch-wednesday-in-glenwood-canyon-rockfall-repair-construction-zone/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT ready to roll on $390 million in road projects in metro Denver area</title>
		<link>http://www.inside-lane.com/2010/04/09/cdot-traffic-watchers-projects/</link>
		<comments>http://www.inside-lane.com/2010/04/09/cdot-traffic-watchers-projects/#comments</comments>
		<pubDate>Fri, 09 Apr 2010 10:00:01 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Featured]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[ARRA]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[C-470]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[I-225]]></category>
		<category><![CDATA[I-25]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 25]]></category>
		<category><![CDATA[Interstate 70]]></category>
		<category><![CDATA[US 36]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4659</guid>
		<description><![CDATA[<img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-CO7-570x405.jpg" alt="The new CO 7 bridge being built by Zak Dirt Inc. over the South Platte River in Brighton is nearly complete. CDOT photo." title="CDOT Traffic Watchers CO7" width="380" class="size-large wp-image-4678" />

More than $390 million in road construction projects on state highways will be underway this year in the metro Denver area, with more than a third of the total funded by the federal stimulus program.]]></description>
			<content:encoded><![CDATA[<div id="attachment_4683" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/Rotator-CDOT-Traffic-Watchers-104th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/Rotator-CDOT-Traffic-Watchers-104th-Ave-570x285.jpg" alt="Hamon Contractors is building the middle segment of the new 104th Avenue bridge in Northglenn, replacing an original I-25 bridge from 1962. CDOT photo." title="Rotator CDOT Traffic Watchers 104th Ave" width="570" height="285" class="size-large wp-image-4683" /></a><p class="wp-caption-text">Hamon Contractors is building the middle segment of the new 104th Avenue bridge in Northglenn, replacing an original I-25 bridge from 1962. CDOT photo.</p></div>
<p><em>By Kevin Flynn<br />
Inside-Lane.com</em></p>
<p><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/Traffic-Watchers-Briefing-2010-Spring-Summer.pdf">More than $390 million in road construction projects</a> on state highways will be underway this year in the metro Denver area, with more than a third of the total funded by the federal stimulus program.</p>
<p>The activity is spread across 32 projects in the <a href="http://www.dot.state.co.us/region-6/">Colorado Department of Transportation’s Region 6</a>, which covers much of the Denver area with the exception of Boulder and Douglas County south of Highlands Ranch. It includes projects <a href="http://www.coloradodot.info/">CDOT </a>is doing plus several city projects in Denver and Aurora on state highways that CDOT is overseeing.</p>
<p><a href="http://www.coloradodot.info/about/regions.html">CDOT’s Region 6 staff led by Region Director Reza Akhavan</a> outlined the projects in a briefing that brought to light some of the savings achieved recently in bidding results that allowed budgeted funds to be plowed back into additional work.</p>
<p>“This will be keeping us very busy this year,” Akhavan said.</p>
<div id="attachment_4689" class="wp-caption alignright" style="width: 310px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Aerial.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Aerial-300x451.jpg" alt="CDOT aerial photo shows grading work at the 120th Avenue Connection project over US 36, looking southwest." title="CDOT Traffic Watchers 120th Aerial" width="300" height="451" class="size-medium wp-image-4689" /></a><p class="wp-caption-text">CDOT aerial photo shows grading work at the 120th Avenue Connection project over US 36, looking southwest.</p></div>
<p>Foremost was savings in the $23.3 million <a href="http://www.coloradodot.info/projects/120AvenueConnection">120th Avenue Connection</a> project in Broomfield, which is providing a straight-across link west-to-east from <a href="http://www.mesalek.com/colo/r120-139.html#128">CO 128</a> to 120th Avenue to allow traffic to bypass the busy Wadsworth/Midway Boulevard interchange with U.S. 36. <a href="http://www.inside-lane.com/2009/09/24/23-million-design-build-job-starts-today-in-broomfield-to-connect-120th-avenue-over-u-s-36/">Inside Lane wrote about this project when ground was broken</a>, and at the time, CDOT didn’t have funding to start the second phase that would include the tie-ins on the east side with 120th.</p>
<p>Now, says CDOT Region 6 North Program Engineer John Schwab, savings achieved through the design-build contracting process used by CDOT and the contractor partnership of <a href="http://www.edkraemer.com/">Edward Kraemer &#038; Sons</a> and <a href="http://www.hntb.com/">HNTB </a>will allow CDOT to begin design work on that second phase, as well as right-of-way acquisition. The hefty construction costs for that phase, estimated up to $40 million, means the rest will have to wait for more funding.</p>
<p>They projects range from the inexpensive– such as a $180,000 paint restriping of Parker Road between Hampden and Belleview Avenues to fit in third lanes in each direction, a small price to squeeze out extra traffic capacity on the busy corridor, and $500,000 for a wildlife fence along U.S. 6 between Heritage Road and 19th Street in Golden – to several in the $30 million and $40 million class.</p>
<p>Because of the lead time to get stimulus-funded projects underway, there are many projects this construction season that are being funded by the <a href="http://www.recovery.gov/Pages/home.aspx">American Recovery and Reinvestment Act</a>. They include the $47.2 construction of a new <a href="http://www.inside-lane.com/2010/03/17/sema-begins-work-on-i-70-design-build-stapleton-interchange/">Central Park Boulevard interchange on Interstate 70 by SEMA Construction </a>to provide better access to Denver’s Stapleton neighborhood and commercial area, the $17.9 million addition of a 17th Avenue interchange on Interstate 225 by Hamon Contractors to ease traffic flows into the Fitzsimons medical campus in Aurora, the <a href="http://www.inside-lane.com/2009/11/17/new-alameda-bridge-over-i-25-to-solve-flooding-problem-and-kick-off-long-list-of-valley-highway-upgrades/">$36.9 million replacement of the Alameda bridge over I-25 in Denver by Jalisco International</a> and a <a href="http://www.inside-lane.com/2009/12/21/huge-santa-fe-flyover-ramp-at-c-470-out-for-bids-next-month-will-eliminate-left-turn-traffic-jams/">new $32 million flyover ramp for southbound Santa Fe Drive to eastbound C-470 by Edward Kraemer and Sons in Littleton</a>.</p>
<p>CDOT also will be starting up projects funded by the new revenue from the <a href="http://www.leg.state.co.us/clics/clics2009a/csl.nsf/fsbillcont/636E40D6A83E4DE987257537001F8AD6?Open&#038;file=108_enr.pdf">FASTER program’s</a> vehicle registration fee hikes. They include new signals, auxiliary lane and realignment of the roadway geometry at the hazardous intersection of CO 7 and York Street in Adams County, more median cable guards on C-470 to prevent crossover head-on crashes and concrete median barrier on South Santa Fe Drive in Littleton.</p>
<p>“While a few large Recovery Act projects are still underway, there are many projects that are just starting that will greatly improve safety and mobility on our highway system,” said CDOT Executive Director Russell George.  “Specifically, there will be several critical bridge and safety projects as a result of FASTER.”</p>
<p><strong><em>Use this map of CDOT&#8217;s Region 6 &#8212; most of the Denver Metro area &#8212; along with the project descriptions below to see where these projects are located. I have put all 32 projects below with details on cost, schedule, work hours and project scope, along with pictures from many of them:</strong></em></p>
<p><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Spring-2010-Map1.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Spring-2010-Map1-570x681.jpg" alt="CDOT Traffic Watchers Spring 2010 Map" title="CDOT Traffic Watchers Spring 2010 Map" width="570" height="681" class="alignleft size-large wp-image-4667" /></a><br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>Metro Denver CDOT Projects Spring-Summer 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
North Area (North Program Engineer John Schwab)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4682" class="wp-caption alignright" style="width: 348px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Ave.jpg" alt="Edward Kraemer and Sons has placed girders at the new 120th Avenue bridge over US 36 has girders and will soon install bridge decking. CDOT photo." title="CDOT Traffic Watchers 120th Ave" width="338" height="255" class="size-full wp-image-4682" /></a><p class="wp-caption-text">Edward Kraemer and Sons has placed girders at the new 120th Avenue bridge over US 36 has girders and will soon install bridge decking. CDOT photo.</p></div>1. 120th Avenue Connection</p>
<p>Cost:</strong> $23.3 million</p>
<p><strong>Contractor:</strong> Edward Kraemer and Sons, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Constructs a new six-lane road across US 36 to connect 120th Avenue and State Highway 128 in Broomfield in order to provide greater connectivity to US 36 and local roadways. This project will construct two of the three phases needed to complete the entire project. As part of this project, a new bridge over US 36 will be constructed as well as a new bridge over Commerce Street. Several local roads such as Commerce Street, Old Wadsworth Boulevard and 118th Avenue will be realigned to correspond with the new roadway. The RTD park-n-Ride facility at Wadsworth Parkway will be relocated near the Broomfield Event Center. Currently, motorists in the Broomfield area can only cross US 36 at Wadsworth Parkway. Due to the lack of continuity with State Highway 128 and 120th Avenue, the US 36/Wadsworth Parkway interchange is heavily congested and State Highway 128 and 120th Avenue are operating at capacity during peak hours. Traffic forecasts indicate at least a doubling in traffic over the next 20 years. The new 120th Avenue Connection will provide relief on these major corridors by improving connectivity, safety and mobility.</p>
<p><strong>Update: </strong>To date, crews have conducted embankment work on 120th Avenue and have begun bridge construction over US 36. Girders and bridge deck panels have been installed for the new bridge over US 36.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> September 2009 through October 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4681" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-104th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-104th-Ave-570x426.jpg" alt="Hamon Contractors is working on the middle segment of the new 104th Avenue bridge over I-25 in Northglenn. CDOT photo." title="CDOT Traffic Watchers 104th Ave" width="570" height="426" class="size-large wp-image-4681" /></a><p class="wp-caption-text">Hamon Contractors is working on the middle segment of the new 104th Avenue bridge over I-25 in Northglenn. CDOT photo.</p></div></p>
<p><strong>2. 104th Avenue over I-25</p>
<p>Cost:</strong> $6.5 million</p>
<p><strong>Contractor:</strong> Hamon Contractors, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Replaces the 104th Avenue bridge over I-25, which was originally constructed in 1962 and is one of Colorado’s structurally deficient bridges. The new bridge will be wider to accommodate an additional left turn lane from eastbound 104th Avenue to northbound I-25.</p>
<p><strong>Update:</strong> The new bridge is being constructed in three phases with work beginning on the northern portion. Currently, crews have completed the northern and middle portions of the new bridge and work will begin on the southern portion towards the end of April.</p>
<p><strong>Work Hours:</strong><br />
<em>I-25:</em> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 5:30 a.m. There will be occasional full closures of I-25 for girder installation, deck panel installation and bridge deck concrete pours.<br />
<em>104th Avenue:</em> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. with double lane closures Sunday through Thursday from 10 p.m. to 5:30 a.m. There will always one lane open in each direction.</p>
<p><strong>Duration:</strong> May 2009 through January 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4680" class="wp-caption alignright" style="width: 310px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-80th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-80th-Ave-300x225.jpg" alt="The original 80th Avenue bridge over U.S. 36 was built in 1951 as part of the Denver-Boulder Turnpike. Structures Inc. will build the replacement. CDOT photo." title="CDOT Traffic Watchers 80th Ave" width="300" height="225" class="size-medium wp-image-4680" /></a><p class="wp-caption-text">The original 80th Avenue bridge over U.S. 36 was built in 1951 as part of the Denver-Boulder Turnpike. Structures Inc. will build the replacement. CDOT photo.</p></div><strong>3. 80th Avenue over US 36</p>
<p>Cost:</strong> $7 million</p>
<p><strong>Contractor:</strong> Structures, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Replaces the 80th Avenue bridge over US 36, which was originally constructed in 1951 and is one of Colorado’s structurally deficient bridges. When complete, the bridge will be wider to accommodate an additional left turn lane from 80th Avenue to Oakwood Drive and a wider sidewalk. The project also realigns 80th Avenue to the east to improve sight distance, access and traffic flow. The improvements will accommodate the future widening of US 36 as determined through the US 36 Environmental Impact Statement.</p>
<p><strong>Work Hours:</strong><br />
<em>US 36:</em> Single lane closures Sunday through Thursday from 10 p.m. to 5:30 a.m. There will be occasional full closures of US 36 for girder installation, bridge deck panel installation and bridge deck concrete pours.<br />
<em>80th Avenue:</em> 80th Avenue will be closed for the duration of the project and a detour route will be in place which takes motorists to either 92nd Avenue on the north or 72nd Avenue on the south.</p>
<p><strong>Duration:</strong> May 2010 through May 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4679" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-I-76.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-I-76-570x427.jpg" alt="SEMA Construction crews are nearing completion on new I-76 bridges over the South Platte River and CO 224 in Adams County. CDOT photo." title="CDOT Traffic Watchers I-76" width="570" height="427" class="size-large wp-image-4679" /></a><p class="wp-caption-text">SEMA Construction crews are nearing completion on new I-76 bridges over the South Platte River and CO 224 in Adams County. CDOT photo.</p></div></p>
<p><strong>4. I-76 over State Highway 224 and I-76 over the Union Pacific Railroad</p>
<p>Cost:</strong> $11 million (ARRA project)</p>
<p><strong>Contractor:</strong> SEMA Construction, Inc.</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Replaces the existing I-76 structures over State Highway 224 and the Union Pacific Railroad, which were both originally built in 1967 and are two of Colorado’s structurally deficient bridges. In addition, the project will construct a crash wall for the I-76 structure over the Union Pacific Railroad as well for the State Highway 224 structure over the Union Pacific Railroad. The crash walls protect the bridge supports in case of a train derailment and are needed for the future North Metro FasTracks line. RTD is funding the design and construction of both walls.</p>
<p><em>Update: </em>The bridges are being constructed in three phases as to not disrupt traffic. Currently, crews have completed the westbound and middle portions of the new bridges and are working on the eastbound portion. Girders have been installed for the final portion and crews will pour the bridge deck in late April.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 7 a.m. to 3:30 p.m. with occasional night work.</p>
<p><strong>Duration:</strong> June 2009 through July 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4678" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-CO7.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-CO7-570x405.jpg" alt="The new CO 7 bridge being built by Zak Dirt Inc. over the South Platte River in Brighton is nearly complete. CDOT photo." title="CDOT Traffic Watchers CO7" width="570" height="405" class="size-large wp-image-4678" /></a><p class="wp-caption-text">The new CO 7 bridge being built by Zak Dirt Inc. over the South Platte River in Brighton is nearly complete. CDOT photo.</p></div></p>
<p><strong>5. State Highway 7 over the Platte River</p>
<p>Cost:</strong> $3.6 million</p>
<p><strong>Contractor:</strong> Zak Dirt, Inc.</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Replaces the existing State Highway 7 structure over the Platte River with a new structure and replaces the existing bridge over the McCann Ditch with a new concrete box culvert. The State Highway 7 bridge over Platte River was originally constructed in 1967 and is one of Colorado’s structurally deficient bridges.</p>
<p><em>Update:</em> To date, crews have completed two thirds of the new bridge and will have the final one third complete by the end of April. In May, crews will pave State Highway 7 in asphalt through the construction zone.</p>
<p><strong>Work Hours: </strong>State Highway 7 is in a temporary alignment with traffic shifted to the south, but all lanes are open in each direction. Occasional night work will take place Sunday through Thursday from 9 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> June 2009 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>6. 96th Avenue at I-76</p>
<p>Cost:</strong> $4.1 million (ARRA project)</p>
<p><strong>Contractor:</strong> Castle Rock Construction Co.</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Constructs roundabouts at the on and off-ramps at the interchange of 96th Avenue and I-76 to improve safety and mobility.</p>
<p><em>Update:</em> The majority of the work is now complete, but crews are finishing work in the southeast quadrant of the roundabouts.</p>
<p><strong>Work Hours:</strong> Single-lane alternating traffic on 96th Avenue Monday through Friday from 7 a.m. to 5:30 p.m. The ramp from eastbound I-76 to 96th Avenue is closed as well as the southeast service road.</p>
<p><strong>Duration:</strong> May 2009 through April 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>7. US 6 over Lakewood Gulch</p>
<p>Quebec Street over Sand Creek</p>
<p>I-70 over I-25</p>
<p>Cost:</strong> $1.1 million</p>
<p><strong>Contractor:</strong> Hamon Contractors, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Repairs bridges at three locations in the Denver metro area. The work includes cleaning and repairing the culvert at US 6 over Lakewood Gulch; removing deteriorating concrete and patching at Quebec Street over Sand Creek; and replacing expansion joints on I-70 over I-25.</p>
<p><em>Update:</em> The work on US 6 over Lakewood Gulch and Quebec Street over Sand Creek is complete. Crews will begin repairs at I-70 over I-25 in May once the expansion joints have been fabricated.</p>
<p><strong>Work Hours:</strong> Single lane closures from 7 p.m. to 5:30 a.m., Sunday through Thursday.</p>
<p><strong>Duration:</strong> February 2010 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>8. Colorado Boulevard (State Highway 2) &#8211; 62nd Avenue to Quebec Street</p>
<p>Cost:</strong> $3.2 million (ARRA project)</p>
<p><strong>Contractor:</strong> LaFarge North America, Inc.</p>
<p><strong>Resident Engineer:</strong> Bill McDonnell</p>
<p><strong>Work:</strong> Resurfaces 2.4 miles of Colorado Boulevard in asphalt and upgrades traffic signals.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 7 a.m. to 4 p.m.</p>
<p><strong>Duration:</strong> May 2010 through September 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>9. US 85 at 144th Avenue</p>
<p>Cost:</strong> $800,000 (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Bill McDonnell</p>
<p><strong>Work:</strong> Constructs raised traffic islands on 144th Avenue to prohibit traffic in both directions of 144th Avenue from making left turns onto US 85 and also from crossing over US 85. Improvements will also be made to the left turn lanes on US 85.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 7 a.m. to 4 p.m. with occasional night work.</p>
<p><strong>Duration:</strong> May 2010 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>10. State Highway 128 &#8211; McCaslin Boulevard to Eldorado Boulevard</p>
<p>Cost:</strong> $1.4 (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Bill McDonnell</p>
<p><strong>Work:</strong> Rotomills and resurfaces approximately one mile of SH 128 in asphalt</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 9 a.m. to 4 p.m. with occasional night work.</p>
<p><strong>Duration:</strong> August 2010 through September 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>Central Area (Central Program Engineer Jim Bemelen)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
11. I-70 at Ward Road</p>
<p>Cost:</strong> $8.5 million</p>
<p><strong>Contractor: </strong>Asphalt Paving, Co.</p>
<p><strong>Resident Engineer:</strong> Ed Martinez</p>
<p><strong>Work:</strong> Reconstructs the eastbound I-70 exit ramps at 44th Avenue/Ward Road by moving the ramps east a quarter of a mile from their current location in order to increase merge distance. The north side of 44th Avenue will also be widened to accommodate two left turn lanes from eastbound 44th Avenue to I-70 as well as one full continuous merge lane on 44th Avenue between the I-70 off-ramp and Ward Road. Following the completion of interchange work, I-70 between Colfax Avenue and Kipling Street will be rotomilled and paved in asphalt. </p>
<p><strong>Work Hours:</strong><br />
<em>I-70:</em> Single lane closures Monday through Friday from 9 a.m. to 2 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m with double lane closures from 10 p.m. to 5:30 a.m.<br />
<em>44th Avenue:</em> Lane closures Monday through Friday from 7 a.m. to 9 p.m. At least two left turn lanes from 44th Avenue to eastbound I-70 must remain open at all times as well as at least one lane of eastbound and westbound 44th Avenue.</p>
<p><strong>Duration: </strong>January 2010 through June 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>12. I-70 &#8211; Colorado Boulevard to Monaco Street</p>
<p>Cost:</strong> $5 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Ed Martinez</p>
<p><strong>Work:</strong> Replaces concrete barrier along I-70, constructs a new crash wall on Colorado Boulevard under I-70 and installs several new permanent sign structures.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 7 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 4 a.m.</p>
<p><strong>Duration:</strong> June 2010 through October 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>13. I-70 &#8211; Brighton Boulevard (State Highway 265) to Colorado Boulevard (State Highway 2)</p>
<p>Cost:</strong> $21.7 million</p>
<p><strong>Contractor:</strong> American Civil Constructors, Inc.</p>
<p><strong>Resident Engineer:</strong> Tony Stewart</p>
<p><strong>Work:</strong> Repairs or replaces 60 expansion joints on the I-70 viaduct, which is over 40 years old. The project also reconstructs the median to improve drainage and replaces the bridge rail. In all, 64 expansion joints will be repaired or replaced on the viaduct between two projects. The first project, which was completed in 2006, repaired or replaced four expansion joints. This work will help extend the life of this aging structure, which was originally constructed in 1964.</p>
<p><strong>Update:</strong> To date, crews have completed the majority of the expansion joint work between Brighton Boulevard and Vasquez Boulevard and have just started work between Vasquez Boulevard and Colorado Boulevard.</p>
<p><strong>Work hours:</strong><br />
<em>I-70:</em> Single lane closures Sunday through Saturday from 8 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 5:30 a.m.<br />
<em>46th Avenue:</em> Various segments of eastbound or westbound 46th Avenue will be closed based on the location of the work on I-70.</p>
<p><strong>Duration:</strong> September 2008 through May 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>14. Colorado Boulevard (State Highway 2) &#8211; Alameda Avenue to Martin Luther King Boulevard</p>
<p>Cost:</strong> $3.8 million</p>
<p><strong>Contractor:</strong> LaFarge West, Inc.</p>
<p><strong>Resident Engineer:</strong> Tony Stewart</p>
<p><strong>Work:</strong> Resurfaces approximately 3.5 miles of Colorado Boulevard in asphalt, reconstructs the median and curb ramps. The traffic signals will be upgraded and turn lanes will be improved at the Colorado Boulevard/Colfax Avenue; Colorado Boulevard/17th Avenue and Colorado Boulevard/Montview Boulevard intersections.</p>
<p><strong>Work hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 9 p.m. to 5 a.m.</p>
<p><strong>Duration:</strong> May 2010 through October 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>15. I-70 at Central Park Boulevard</p>
<p>Cost:</strong> $47.2 million (ARRA project)</p>
<p><strong>Contractor:</strong> SEMA Construction, Inc.</p>
<p><strong>Resident Engineer: </strong>Tony Stewart</p>
<p><strong>Work:</strong> Constructs a full interchange at I-70 and Central Park Boulevard which is between Havana Street and Quebec Street. The project will construct all ramps and structures for eastbound and westbound I-70 and for Central Park Boulevard. I-70 between Sand Creek and Havana Street will also be paved in asphalt. This project is being funded by the City and County of Denver with CDOT oversight.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 9 p.m. to 5:30 a.m. with double lane closures from 11 p.m. to 5:30 a.m. Occasional weekend work is possible.</p>
<p><strong>Duration:</strong> June 2010 through Spring 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>16. US 287 from 10th Avenue to Baseline Road (State Highway 7)</p>
<p>Cost:</strong> $5.9 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Randy Furst </p>
<p><strong>Work:</strong> Replaces approximately 230 concrete slabs, rotomills and paves two bridges on US 287 and conducts erosion control work on the east side of US 287.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m.</p>
<p><strong>Duration:</strong> May 2010 through December 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>17. Federal Boulevard (US 287) at 120th Avenue (State Highway 128)<br />
Sheridan Boulevard (State Highway 95) &#8211; 52nd Avenue to 56th Avenue</p>
<p>Cost:</strong> $664,000</p>
<p><strong>Contractor:</strong> K.E.C.I Colorado, Inc.</p>
<p><strong>Resident Engineer:</strong> Randy Furst</p>
<p><strong>Work:</strong> Upgrades the traffic signals at both locations to include mast arm poles and LED lights. A raised median will also be installed on Sheridan Avenue between 52nd Avenue and 56th Avenue to improve safety</p>
<p><strong>Work Hours: </strong>Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m.</p>
<p><strong>Duration:</strong> March 2010 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>South Area (South Program Engineer Paul Jesaitis)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4677" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Arapahoe-I-25.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Arapahoe-I-25-570x412.jpg" alt="Structures Inc. has excavation underway for the widening of Arapahoe Road under I-25. CDOT photo." title="CDOT Traffic Watchers Arapahoe I-25" width="570" height="412" class="size-large wp-image-4677" /></a><p class="wp-caption-text">Structures Inc. has excavation underway for the widening of Arapahoe Road under I-25. CDOT photo.</p></div></p>
<p>18. Arapahoe Road (State Highway 88) &#8211; Yosemite Street to Boston/Clinton Street</p>
<p>Cost:</strong> $2.4 million</p>
<p><strong>Contractor:</strong> Structures, Inc.</p>
<p><strong>Resident Engineer:</strong> Abe Lavassani</p>
<p><strong>Work:</strong> Adds an additional through lane in each direction by placing the new lanes where the existing on-ramp lanes exist. This means that the third lane will be separated from the existing through lanes by the pier columns. In addition, a turn lane on westbound Arapahoe Road between the southbound I-25 off-ramp and Yosemite Street will be added and the center median will be modified to accommodate the new configuration.</p>
<p><strong>Update:</strong> The majority of the work has been completed, but median work and paving remain. Over the next couple of months, crews will remove the medians on eastbound and westbound Arapahoe Road, pave the additional lane from southbound I-25 to westbound Arapahoe Road, complete asphalt paving through the construction zone and complete landscaping.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 9 a.m. to 3:30 p.m. and Sunday through Thursday from 7:30 p.m. to 5:30 a.m. There will be occasional weekend work.</p>
<p><strong>Duration:</strong> September 2009 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>19. Southbound I-25 to I-225<br />
Parker Road (State Highway 83) to Southbound I-225</p>
<p>Cost:</strong> $1.5 million</p>
<p><strong>Contractor:</strong> ABCO Construction, Inc.</p>
<p><strong>Resident Engineer:</strong> Abe Lavassani</p>
<p><strong>Work: </strong>Installs an anti-icing treatment on the ramps from southbound I-25 to northbound I-225 and northbound Parker Road to southbound I-225 to improve traction. Automatic anti-icing systems will also be installed on the ramp from southbound I-25 to northbound I-225 and from southbound I-225 to southbound I-25.</p>
<p><strong>Update: </strong>The traction material has been installed on the ramp from southbound I-25 to northbound I-225 and on one lane of the ramp from northbound Parker Road to southbound I-225. Crews will likely return in May to complete the paving on the second lane of the northbound Parker Road to southbound I-225 ramp. Crews will be wrapping up the installation of the two anti-icing systems in the next couple of weeks.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. and from 9 p.m. Friday to 5 a.m. on Monday.</p>
<p><strong>Duration:</strong> October 2009 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>20. Parker Road (State Highway 83) at Arapahoe Road (State Highway 88)</p>
<p>Cost:</strong> $30 million (estimate)</p>
<p><strong>Contractor: </strong>Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Abe Lavassani</p>
<p><strong>Work: </strong>The final phase of this interchange improvement project constructs a grade-separated interchange and the corresponding ramps and improves drainage. When complete, Parker Road will run over Arapahoe Road and the traffic signal will be removed for free-flowing traffic at the interchange.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 9 a.m. to 3:30 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m. Throughout construction, Parker Road or Arapahoe Road may be placed in a temporary alignment.</p>
<p>Duration: May 2010 through December 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>21. I-225 at Colfax Avenue (US 40)- Phase I</p>
<p>Cost:</strong> $1.4 million (ARRA project)</p>
<p><strong>Contractor:</strong> Concrete Works of Colorado</p>
<p><strong>Resident Engineer:</strong> Rick Erjavec</p>
<p><strong>Work: </strong>This is the first phase of an interchange improvement project. This phase will reconstruct the southbound I-225 off-ramp to Colfax Avenue as well as the northbound I-225 on-ramp from Colfax Avenue. Drainage improvements will also be made. The City of Aurora will construct this phase with CDOT oversight.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. or Sunday through Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> November 2009 through April 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>22. I-225 at Colfax Avenue (US 40)- Phase 2</p>
<p>Cost:</strong> $17.9 million (ARRA project)</p>
<p><strong>Contractor:</strong> Hamon Contractors, Inc.</p>
<p><strong>Resident Engineer:</strong> Rick Erjavec</p>
<p><strong>Work: </strong>The second phase of the interchange improvement project will construct the southbound off-ramp to 17th Avenue and Colfax Avenue along with the southern portion of 17th Avenue to serve inbound traffic. The City of Aurora will construct this phase with CDOT oversight.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. or Sunday through Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> April 2010 through December 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>23. I-225 &#8211; 2nd Avenue to Mississippi Avenue</p>
<p>Cost:</strong> $33 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Rick Erjavec</p>
<p><strong>Work:</strong> Widens I-225 between 2nd Avenue and Mississippi Avenue to accommodate three lanes in each direction with an additional auxiliary lane. I-225 from north of Colfax Avenue to 2nd Avenue will be restriped to also accommodate three lanes in each direction. A new 8-10 foot concrete noise wall will be constructed near Mississippi Avenue to replace the deteriorating wooden fence and a new 8-10 foot noise wall will be constructed near Potomac Circle.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. or Sunday through Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> June 2010 through August 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4676" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-C-470.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-C-470-570x392.jpg" alt="Castle Rock Construction crews continue to work on rehabilitation of the C-470 roadway. CDOT photo." title="CDOT Traffic Watchers C-470" width="570" height="392" class="size-large wp-image-4676" /></a><p class="wp-caption-text">Castle Rock Construction crews continue to work on rehabilitation of the C-470 roadway. CDOT photo.</p></div></p>
<p><strong>24. C-470 &#8211; I-25 to Santa Fe Drive (US 85)<br />
C-470 Bike Trail &#8211; I-25 to I-70</p>
<p>Cost:</strong> $32 million (ARRA project)</p>
<p><strong>Contractor:</strong> Castle Rock Construction Co.</p>
<p><strong>Resident Engineer:</strong> Ron Buck</p>
<p><strong>Work:</strong> Repairs or replaces concrete slabs along nine miles of C-470 and resurfaces C-470 in asphalt. Rehabilitates and replaces concrete slabs on the C-470 bicycle/pedestrian trail.</p>
<p><strong>Update: </strong>To date, the concrete repairs are complete on westbound C-470 and the majority of eastbound C-470. Crews will complete the concrete work on eastbound C-470 in the coming months and then begin asphalt paving on both eastbound and westbound C-470. Bike path work is also still underway.</p>
<p><strong>Work Hours: </strong>The majority of the roadway work on C-470 will take place from 8 p.m. Friday to 5 a.m. Monday each weekend. Single lane closures are also possible Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m. Work on the bike path will take place Monday through Friday from 8:30 a.m. to 5 p.m.</p>
<p><strong>Duration:</strong> July 2009 through September 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4671" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Alameda-Bridge.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Alameda-Bridge-570x394.jpg" alt="The 1958 Valley Highway bridge over Alameda Avenue -- and the flash flooding that often occurs underneath it -- will be things of the past with a replacement project now getting underway by Jalisco International. CDOT photo." title="CDOT Traffic Watchers Alameda Bridge" width="570" height="394" class="size-large wp-image-4671" /></a><p class="wp-caption-text">The 1958 Valley Highway bridge over Alameda Avenue -- and the flash flooding that often occurs underneath it -- will be things of the past with a replacement project now getting underway by Jalisco International. CDOT photo.</p></div></p>
<p><strong>25. I-25 at Alameda Avenue</p>
<p>Cost:</strong> $36.9 million (ARRA project)</p>
<p><strong>Contractor:</strong> Jalisco International, Inc.</p>
<p><strong>Resident Engineer:</strong> Ron Buck</p>
<p><strong>Work:</strong> Replaces the Alameda Avenue bridge over I-25 with one that is wider to accommodate an additional lane in each direction. Minor improvements will also be made to I-25 under Alameda Avenue and drainage will be improved. This work is part of a larger project that will eventually improve I-25 as determined in the I-25 Valley Highway Environmental Impact Statement.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5 a.m. with occasional weekend work.</p>
<p><strong>Duration:</strong> April 2010 through September 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>26. Santa Fe Drive (US 85) at C-470</p>
<p>Cost:</strong> $32 million (ARRA project)</p>
<p><strong>Contractor</strong>: Edward Kraemer &#038; Sons, Inc.</p>
<p><strong>Resident Engineer:</strong> Ron Buck</p>
<p><strong>Work: </strong>Constructs a flyover ramp from southbound Santa Fe Drive to eastbound C-470 to improve safety and mobility.</p>
<p><strong>Work Hours:</strong><br />
<em>Santa Fe Drive: </em>Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 8 p.m. to 5:30 a.m.<br />
<em>C-470:</em> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. Full closures of C-470 will also be required for girder installation, bridge deck panel installation and concrete deck pour.</p>
<p><strong>Duration:</strong> June 2010 through January 2012<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>27. I-25 &#8211; 6th Avenue to 23rd Avenue</p>
<p>Cost:</strong> $4.3 million (ARRA project)</p>
<p><strong>Contractor:</strong> Brannan Sand and Gravel Co.</p>
<p><strong>Resident Engineer:</strong> Tony Gross</p>
<p><strong>Work:</strong> Rotomills and resurfaces approximately three miles of I-25 in asphalt.</p>
<p><strong>Update: </strong>The majority of work is complete, but crews need to complete some smoothness grinding and some erosion control work.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5 a.m.</p>
<p><strong>Duration:</strong> June 2009 through April 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4674" class="wp-caption alignright" style="width: 310px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Hampden-Federal.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Hampden-Federal-300x223.jpg" alt="Concrete Express crews excavate for new bridge pier footings at the Hampden Avenue bridge over Federal Boulevard. CDOT photo." title="CDOT Traffic Watchers Hampden Federal" width="300" height="223" class="size-medium wp-image-4674" /></a><p class="wp-caption-text">Concrete Express crews excavate for new bridge pier footings at the Hampden Avenue bridge over Federal Boulevard. CDOT photo.</p></div></p>
<p><strong>28. Hampden Avenue (US 285) -Kipling Street to Federal Boulevard</p>
<p>Cost:</strong> $40.1 million</p>
<p><strong>Contractor: </strong>Concrete Express, Inc.</p>
<p><strong>Resident Engineer:</strong> Tony Gross</p>
<p><strong>Work: </strong>Replaces the Wadsworth Boulevard (State Highway 121), Pierce Street and Federal Boulevard (State Highway 88) bridges over Hampden Avenue and reconstructs Hampden Avenue between Wadsworth Boulevard and Federal Boulevard.</p>
<p><strong>Update:</strong> Construction started near Federal Boulevard with crews realigning Hampden Avenue to accommodate reconstruction in the median. In late April/early May, construction will begin to replace the Hampden Avenue bridge over Federal Boulevard. Construction will continue to move west as work progresses.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m. Full closures of Hampden Avenue will also be required for girder installation, bridge deck panel installation and concrete deck pour.</p>
<p><strong>Duration:</strong> January 2010 through June 2011</p>
<p><strong>Region 6 Traffic Engineering Projects (Traffic Engineer Steve Hersey)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
29. State Highway 7 at York Street</p>
<p>Cost:</strong> $750,000 (estimate)</p>
<p><strong>Contractor: </strong>Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Adds an auxiliary lane on State Highway 7 from 168th Avenue to York Street and installs a new traffic signal at the SH 7/York Street intersection.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m.</p>
<p><strong>Duration:</strong> June 2010 through November 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>30. C-470 &#8211; Quebec Street to I-25<br />
C-470 &#8211; Morrison Road to Wadsworth Boulevard<br />
Santa Fe Drive (US 85)- Aspen Grove Way to Ridge Road</p>
<p>Cost:</strong> $3.3 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Leela Rajasekar</p>
<p><strong>Work:</strong> Installs median cable guardrail in two locations along C-470 to help prevent crossover accidents. Concrete median barrier will also be installed on Santa Fe Drive.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5 a.m.</p>
<p><strong>Duration:</strong> June 2010 through February 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>31. US 6 &#8211; Heritage Road to 19th Avenue</p>
<p>Cost:</strong> $500,000 (estimate)</p>
<p><strong>Contractor: </strong>Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Leela Rajasekar</p>
<p><strong>Work:</strong> Installs a wildlife fence along US 6 to help prevent wildlife/vehicle collisions.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through<br />
Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> August 2010 through November 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>32. Parker Road (State Highway 83) &#8211; Belleview Avenue to Hampden Avenue</p>
<p>Cost:</strong> $180,000 (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Alazar Tesfaye</p>
<p><strong>Work: </strong>Restripes Parker Road to accommodate a third through lane in each direction.</p>
<p><strong>Work Hours:</strong> Sunday through Thursday from 8 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> May 2010 through June 2010</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/09/cdot-traffic-watchers-projects/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT: Traffic switch in Glenwood Canyon around rockfall repair work zone</title>
		<link>http://www.inside-lane.com/2010/03/31/cdot-traffic-switch-in-glenwood-canyon-around-rockfall-repair-work-zone/</link>
		<comments>http://www.inside-lane.com/2010/03/31/cdot-traffic-switch-in-glenwood-canyon-around-rockfall-repair-work-zone/#comments</comments>
		<pubDate>Wed, 31 Mar 2010 14:51:22 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[Glenwood Canyon]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>
		<category><![CDATA[rockslide]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4616</guid>
		<description><![CDATA[CDOT Media Release

Traffic Switch in Glenwood Canyon: Westbound traffic switched over to eastbound lane through rockfall work zone

March 30, 2010 - Northwestern Colorado/CDOT Region 3 - The Colorado Department of Transportation and contractor Flatiron Construction Corporation will switch traffic March 31, starting around 7 AM. 

GLENWOOD CANYON - The Colorado Department of Transportation and contractor Flatiron Construction Corporation will switch traffic tomorrow, starting around 7 AM. Westbound traffic will be switched onto the inside eastbound lane through the work zone, separated from the single lane of eastbound traffic by a concrete barrier. Putting both directions of traffic onto the eastbound lanes will enable the contractor to complete repairs on the concrete retaining wall and the westbound bridge deck. While in this configuration, the speed limit for eastbound traffic will remain at the lowered 40 mph; the speed for westbound traffic will be lowered to 25 mph, however, due to the lane switches in this short section-which is approximately 1,000 feet. The width restriction remains at 14 feet.

REPAIR WORK: The repair work is taking place between mile markers 124 and 125, just west of Hanging Lake Tunnel. The work will involve bridge deck and bridge wall/rail repairs (including 150 feet of new steel bridge rail); guardrail repairs (about 120 linear feet) to hillside concrete barrier; median concrete barrier repair (replacement of 400 linear feet); removal and replacement of 690 square feet of concrete retaining walls; straightening of steel bridge girders using a flame straightening process; some lighting and electrical repairs; and repairs to the bike trail below. Finally, the contractor will use approximately 500 tons of base course material on the roadway, as well as 400 tons of patching asphalt to repair the driving surface.

REGULAR TRAFFIC IMPACTS:   Work will be done during the day, Monday through Saturday. There will be a single lane of traffic open in each direction, but motorists may encounter occasional traffic stops, when safety or equipment mobilization warrant. The speed limit is reduced from 50 to 40 mph; delays should be very minimal. Motorists are urged to obey the reduced speed limit and maintain a safe following distance while driving through the work zone. There is a 14-foot width restriction. While the Glenwood Canyon bike path should open sometime in April, the section between the Shoshone power plant and Hanging Lake rest area will remain closed for safety until the project is completed in May. Thank you for going " Slow for the Cone Zone !" 

ROCKFALL INCIDENT INFORMATION:   Just after midnight, on March 8, a large rockslide hit I-70 in Glenwood Canyon near mile marker 125, just west of Hanging Lake Tunnel. I-70 was closed in both directions to all traffic between Glenwood Springs (mm 116) and Dotsero (mm 133). The interstate reopened to a single lane of traffic in each direction on the afternoon of Thursday, March 11.

The rockfall brought 20 boulders onto the interstate, ranging in size from 3 feet to10 feet in diameter. The largest weighed about 66 tons. The rocks made holes in the elevated sections of roadway-the largest being in the westbound lanes (closest to the hillside) and measuring 20 feet by 10 feet. Another hole in the lower eastbound lanes measured 6 feet by 6 feet. There were a half a dozen other holes and "dips" in the roadway, as well as areas where rocks were embedded. Most of these repair areas were approximately 5 feet by 5 feet. Rocks were scattered over 100 yards of roadway. Also damaged were three sections of steel guard rail and median barrier.
For information about other CDOT projects, the public may log on to <a href="http://www.coloradodot.info">www.coloradodot.info</a> or call 511. To receive information directly, log on to this web site and click the icon in upper right corner entitled "Sign up for Email and Wireless Alerts."]]></description>
			<content:encoded><![CDATA[<p><strong>CDOT Media Release</p>
<p>Traffic Switch in Glenwood Canyon: Westbound traffic switched over to eastbound lane through rockfall work zone</strong></p>
<p>March 30, 2010 &#8211; Northwestern Colorado/CDOT Region 3 &#8211; The Colorado Department of Transportation and contractor Flatiron Construction Corporation will switch traffic March 31, starting around 7 AM. </p>
<p><strong>GLENWOOD CANYON</strong> &#8211; The Colorado Department of Transportation and contractor Flatiron Construction Corporation will switch traffic tomorrow, starting around 7 AM. Westbound traffic will be switched onto the inside eastbound lane through the work zone, separated from the single lane of eastbound traffic by a concrete barrier. Putting both directions of traffic onto the eastbound lanes will enable the contractor to complete repairs on the concrete retaining wall and the westbound bridge deck. While in this configuration, the speed limit for eastbound traffic will remain at the lowered 40 mph; the speed for westbound traffic will be lowered to 25 mph, however, due to the lane switches in this short section-which is approximately 1,000 feet. The width restriction remains at 14 feet.</p>
<p><strong>REPAIR WORK: </strong>The repair work is taking place between mile markers 124 and 125, just west of Hanging Lake Tunnel. The work will involve bridge deck and bridge wall/rail repairs (including 150 feet of new steel bridge rail); guardrail repairs (about 120 linear feet) to hillside concrete barrier; median concrete barrier repair (replacement of 400 linear feet); removal and replacement of 690 square feet of concrete retaining walls; straightening of steel bridge girders using a flame straightening process; some lighting and electrical repairs; and repairs to the bike trail below. Finally, the contractor will use approximately 500 tons of base course material on the roadway, as well as 400 tons of patching asphalt to repair the driving surface.</p>
<p><strong>REGULAR TRAFFIC IMPACTS: </strong>  Work will be done during the day, Monday through Saturday. There will be a single lane of traffic open in each direction, but motorists may encounter occasional traffic stops, when safety or equipment mobilization warrant. The speed limit is reduced from 50 to 40 mph; delays should be very minimal. Motorists are urged to obey the reduced speed limit and maintain a safe following distance while driving through the work zone. There is a 14-foot width restriction. While the Glenwood Canyon bike path should open sometime in April, the section between the Shoshone power plant and Hanging Lake rest area will remain closed for safety until the project is completed in May. Thank you for going &#8221; Slow for the Cone Zone !&#8221; </p>
<p><strong>ROCKFALL INCIDENT INFORMATION:</strong>   Just after midnight, on March 8, a large rockslide hit I-70 in Glenwood Canyon near mile marker 125, just west of Hanging Lake Tunnel. I-70 was closed in both directions to all traffic between Glenwood Springs (mm 116) and Dotsero (mm 133). The interstate reopened to a single lane of traffic in each direction on the afternoon of Thursday, March 11.</p>
<p>The rockfall brought 20 boulders onto the interstate, ranging in size from 3 feet to10 feet in diameter. The largest weighed about 66 tons. The rocks made holes in the elevated sections of roadway-the largest being in the westbound lanes (closest to the hillside) and measuring 20 feet by 10 feet. Another hole in the lower eastbound lanes measured 6 feet by 6 feet. There were a half a dozen other holes and &#8220;dips&#8221; in the roadway, as well as areas where rocks were embedded. Most of these repair areas were approximately 5 feet by 5 feet. Rocks were scattered over 100 yards of roadway. Also damaged were three sections of steel guard rail and median barrier.<br />
For information about other CDOT projects, the public may log on to <a href="http://www.coloradodot.info">www.coloradodot.info</a> or call 511. To receive information directly, log on to this web site and click the icon in upper right corner entitled &#8220;Sign up for Email and Wireless Alerts.&#8221;</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/31/cdot-traffic-switch-in-glenwood-canyon-around-rockfall-repair-work-zone/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Colorado Independent: Full high-speed rail network on I-25 and I-70 would be $22 billion</title>
		<link>http://www.inside-lane.com/2010/03/27/colorado-independent-full-high-speed-rail-network-on-i-25-and-i-70-wold-be-22-billion/</link>
		<comments>http://www.inside-lane.com/2010/03/27/colorado-independent-full-high-speed-rail-network-on-i-25-and-i-70-wold-be-22-billion/#comments</comments>
		<pubDate>Sat, 27 Mar 2010 22:49:57 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[high speed rail]]></category>
		<category><![CDATA[I-25]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>
		<category><![CDATA[Rocky Mountain Rail Authority]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4597</guid>
		<description><![CDATA[The Colorado Independent reports that the Rocky Mountain Rail Authority estimates high-speed passenger rail service on dedicated tracks along the Interstate 25 and Interstate 70 corridors will cost $22 billion and likely require up to 50-percent funding by Colorado taxpayers,.

Harry Dale, the authority’s chairman, Harry Dale, said the higher cost of building dedicated lines rather than using existing freight lines or right-of-ways makes long-term financial sense. The assessment in part of a $1.5 million feasibility study funded mostly by the Colorado Department of Transportation.

High-speed trains traveling in excess of 100 mph would command premium fares allowing for a model of $2 in fare revenue for every $1 of operational costs. That means a private company could operate a Colorado franchise at a profit, eliminating the need for annual operational subsidies, the study says.]]></description>
			<content:encoded><![CDATA[<p><a href="http://coloradoindependent.com/50016/study-puts-colorado-high-speed-passenger-rail-price-tag-at-22-billion">The Colorado Independent reports</a> that the Rocky Mountain Rail Authority estimates high-speed passenger rail service on dedicated tracks along the Interstate 25 and Interstate 70 corridors will cost $22 billion and likely require up to 50-percent funding by Colorado taxpayers.</p>
<p>Harry Dale, the authority’s chairman, Harry Dale, said the higher cost of building dedicated lines rather than using existing freight lines or right-of-ways makes long-term financial sense. The assessment in part of a $1.5 million feasibility study funded mostly by the Colorado Department of Transportation.</p>
<p>High-speed trains traveling in excess of 100 mph would command premium fares allowing for a model of $2 in fare revenue for every $1 of operational costs. That means a private company could operate a Colorado franchise at a profit, eliminating the need for annual operational subsidies, the study says.</p>
<p><a href="http://coloradoindependent.com/50016/study-puts-colorado-high-speed-passenger-rail-price-tag-at-22-billion">Go to the Colorado Independent to see the entire article</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/27/colorado-independent-full-high-speed-rail-network-on-i-25-and-i-70-wold-be-22-billion/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Summit County Citizens Voice: High-speed rail feasibility study for I-70, I-25 corridors nears final release</title>
		<link>http://www.inside-lane.com/2010/03/26/summit-county-citizens-voice-high-speed-rail-feasibility-study-for-i-70-i-25-corridors-nears-final-release/</link>
		<comments>http://www.inside-lane.com/2010/03/26/summit-county-citizens-voice-high-speed-rail-feasibility-study-for-i-70-i-25-corridors-nears-final-release/#comments</comments>
		<pubDate>Fri, 26 Mar 2010 14:13:27 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[high speed rail]]></category>
		<category><![CDATA[I-25]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 25]]></category>
		<category><![CDATA[Interstate 70]]></category>
		<category><![CDATA[Rocky Mountain Rail Authority]]></category>
		<category><![CDATA[Transit]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4589</guid>
		<description><![CDATA[The Summit County Citizens Voice reports that the Rocky Mountain Rail Authority is close to releasing a final version of its feasibility study for high-speed rail, which would run north-south along the Interstate 25 corridor between Fort Collins and Pueblo, and east-west along Interstate 70 between Eagle and Denver International Airport.

“There are a whole slew of alternatives that are feasible,” said Harry Dale, Clear Creek County commissioner and chairman of the authority.]]></description>
			<content:encoded><![CDATA[<p><a href="http://summitcountyvoice.com/2010/03/26/rail-group-finalizing-feasibility-study/">The Summit County Citizens Voice reports</a> that the Rocky Mountain Rail Authority is close to releasing a final version of its feasibility study for high-speed rail, which would run north-south along the Interstate 25 corridor between Fort Collins and Pueblo, and east-west along Interstate 70 between Eagle and Denver International Airport.</p>
<p>“There are a whole slew of alternatives that are feasible,” said Harry Dale, Clear Creek County commissioner and chairman of the authority.</p>
<p><a href="http://summitcountyvoice.com/2010/03/26/rail-group-finalizing-feasibility-study/">Go to the Summit County Citizens Voice to read the entire article</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/26/summit-county-citizens-voice-high-speed-rail-feasibility-study-for-i-70-i-25-corridors-nears-final-release/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT: Flatiron starts with Glenwood Canyon repairs, can earn incentive for beating May 15 completion</title>
		<link>http://www.inside-lane.com/2010/03/22/cdot-flatiron-starts-with-glenwood-canyon-repairs-can-earn-incentive-for-beating-may-15-completion/</link>
		<comments>http://www.inside-lane.com/2010/03/22/cdot-flatiron-starts-with-glenwood-canyon-repairs-can-earn-incentive-for-beating-may-15-completion/#comments</comments>
		<pubDate>Tue, 23 Mar 2010 00:27:32 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[Glenwood Canyon]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>
		<category><![CDATA[rockfall]]></category>
		<category><![CDATA[rockslide]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4533</guid>
		<description><![CDATA[CDOT Media Release

Repairs begin at Glenwood Canyon Rockfall Site Today
 
Contract set with an early completion incentive designed to expedite work
  
GLENWOOD CANYON – The Colorado Department of Transportation begins repairs today (March 22) on damage caused by the rockfall incident on I-70 in Glenwood Canyon on March 8. Flatiron Construction Corporation of Longmont will be making the repairs. The cost of the repair project is approximately $860,000. However, the total cost of the rockfall event—including CDOT maintenance and design work—is expected to be much higher (that figure will be reported at a later date).]]></description>
			<content:encoded><![CDATA[<p><strong>CDOT Media Release</p>
<p>Repairs begin at Glenwood Canyon Rockfall Site Today</p>
<p>Contract set with an early completion incentive designed to expedite work</strong></p>
<p>GLENWOOD CANYON – The Colorado Department of Transportation begins repairs today (March 22) on damage caused by the rockfall incident on I-70 in Glenwood Canyon on March 8. Flatiron Construction Corporation of Longmont will be making the repairs. The cost of the repair project is approximately $860,000. However, the total cost of the rockfall event—including CDOT maintenance and design work—is expected to be much higher (that figure will be reported at a later date).</p>
<p>Because of the critical need to expedite repairs on the interstate, the contract carries with it a $5,000/day incentive for early completion (with $5,000 deducted each day the work runs past their set completion date). Flatiron Construction, in its bid package, set a completion date of May 15; the company can earn a maximum of $31,000 in early-completion incentives by beating this projected date.</p>
<p>The repair work is taking place between mile markers 124 and 125, just west of Hanging Lake Tunnel. The work will involve bridge deck and bridge wall/rail repairs (including 150 feet of new steel bridge rail); guardrail repairs (about 120 linear feet) to hillside concrete barrier; median concrete barrier repair (replacement of 400 linear feet); removal and replacement of 690 square feet of concrete retaining walls; straightening of steel bridge girders using a flame straightening process; some lighting and electrical repairs; and repairs to the bike trail below. Finally, the contractor will use approximately 500 tons of base course material on the roadway, as well as 400 tons of patching asphalt to repair the driving surface.</p>
<p>TRAFFIC IMPACTS:  Work will be done during the day, Monday through Saturday. There will be a single lane of traffic open in each direction, but motorists may encounter occasional traffic stops, when safety or equipment mobilization warrant. The speed limit is reduced from 50 to 40 mph; delays should be very minimal. Motorists are urged to obey the reduced speed limit and maintain a safe following distance while driving through the work zone. There is a 14-foot width restriction. While the Glenwood Canyon bike path should open sometime in April, the section between the Shoshone power plant and Hanging Lake rest area will remain closed for safety until the project is completed in May. Thank you for going “Slow for the Cone Zone!”</p>
<p>ROCKFALL INCIDENT INFORMATION:  Just after midnight, on March 8, a large rockslide hit I-70 in Glenwood Canyon near mile marker 125, just west of Hanging Lake Tunnel. I-70 was closed in both directions to all traffic between Glenwood Springs (mm 116) and Dotsero (mm 133). The interstate reopened to a single lane of traffic in each direction on the afternoon of Thursday, March 11.</p>
<p>The rockfall brought 20 boulders onto the interstate, ranging in size from 3 feet to10 feet in diameter. The largest weighed about 66 tons. The rocks made holes in the elevated sections of roadway—the largest being in the westbound lanes (closest to the hillside) and measuring 20 feet  by 10 feet. Another hole in the lower eastbound lanes measured 6 feet by 6 feet. There were a half a dozen other holes and “dips” in the roadway, as well as areas where rocks were embedded. Most of these repair areas were approximately 5 feet by 5 feet. Rocks were scattered over 100 yards of roadway. Also damaged were three sections of steel guard rail and median barrier.<br />
For information about other CDOT projects, the public may log on to www.coloradodot.info or call 511. To receive information directly, log on to this web site and click the icon in upper right corner entitled &#8220;Sign up for Email and Wireless Alerts.&#8221; </p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/22/cdot-flatiron-starts-with-glenwood-canyon-repairs-can-earn-incentive-for-beating-may-15-completion/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Summit County Citizens Voice: Bill to restrict I-70 trucks to right lane on steep grades raises some concerns</title>
		<link>http://www.inside-lane.com/2010/03/18/summit-county-citizens-voice-bill-to-restrict-i-70-trucks-to-right-lane-on-steep-grades-raises-some-concerns/</link>
		<comments>http://www.inside-lane.com/2010/03/18/summit-county-citizens-voice-bill-to-restrict-i-70-trucks-to-right-lane-on-steep-grades-raises-some-concerns/#comments</comments>
		<pubDate>Thu, 18 Mar 2010 13:58:23 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4470</guid>
		<description><![CDATA[The Summit County Citizens Voice reports that state Sen. Dan Gibbs is pressing ahead with a pair of new laws aimed at easing despite some misgivings on the part of law enforcement officers. 

“I think people want action,” Gibbs said, explaining that a measure requiring heavy trucks to stay in the slow lane on steep grades is straight-forward and aimed at three specific areas along the I-70 corridor: Floyd Hill, the Eisenhower-Johnson Tunnel approaches and Vail Pass.

Senate Bill 173 has been assigned to the transportation committee and hasn’t faced any votes yet. ]]></description>
			<content:encoded><![CDATA[<p><a href="http://summitcountyvoice.com/2010/03/17/state-sen-dan-gibbs-presses-ahead-with-i-70-laws/">The Summit County Citizens Voice reports</a> that state Sen. Dan Gibbs is pressing ahead with a pair of new laws aimed at easing despite some misgivings on the part of law enforcement officers. </p>
<p>“I think people want action,” Gibbs said, explaining that a measure requiring heavy trucks to stay in the slow lane on steep grades is straight-forward and aimed at three specific areas along the I-70 corridor: Floyd Hill, the Eisenhower-Johnson Tunnel approaches and Vail Pass.</p>
<p>Senate Bill 173 has been assigned to the transportation committee and hasn’t faced any votes yet. </p>
<p><a href="http://summitcountyvoice.com/2010/03/17/state-sen-dan-gibbs-presses-ahead-with-i-70-laws/">Go to the Summit County Citizens Voice to see the entire item</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/18/summit-county-citizens-voice-bill-to-restrict-i-70-trucks-to-right-lane-on-steep-grades-raises-some-concerns/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Work starts on design-build I-70 interchange at Stapleton&#8217;s Central Park Boulevard</title>
		<link>http://www.inside-lane.com/2010/03/17/sema-begins-work-on-i-70-design-build-stapleton-interchange/</link>
		<comments>http://www.inside-lane.com/2010/03/17/sema-begins-work-on-i-70-design-build-stapleton-interchange/#comments</comments>
		<pubDate>Wed, 17 Mar 2010 10:00:52 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Highways]]></category>
		<category><![CDATA[ARRA]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Denver]]></category>
		<category><![CDATA[DRCOG]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>
		<category><![CDATA[Stapleton]]></category>
		<category><![CDATA[stimulus]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4406</guid>
		<description><![CDATA[Where jetliners used to cross Interstate 70, Denver soon will be building a new $50.6 million interchange project that will reunite the south side of the old Stapleton airfield with the north side. But this time, it’s not 747s or DC-10s that will go over top of I-70 traffic, but Stapleton neighborhood residents, regional shoppers and other highway travelers.]]></description>
			<content:encoded><![CDATA[<div id="attachment_4414" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/03/Stapleton-I-70-3.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/03/Stapleton-I-70-3-570x300.jpg" alt="Denver&#039;s design shows the new bridge, in green, with a traditional diamond-type interchange on I-70 and a set of braided ramps, in purple, on the west side connecting to I-270." title="Stapleton I-70 3" width="570" height="300" class="size-large wp-image-4414" /></a><p class="wp-caption-text">Denver's design shows the new bridge, in green, with a traditional diamond-type interchange on I-70 and a set of braided ramps, in purple, on the west side connecting to I-270.</p></div>
<p><em>By Kevin Flynn<br />
Inside-Lane.com</em></p>
<p>Where jetliners used to cross <a href="http://www.mesalek.com/colo/i70.html">Interstate 70</a>, Denver soon will be building a new $50.6 million interchange project that will reunite the south side of the <a href="http://www.airfields-freeman.com/CO/Airfields_CO_Denver_NE.htm#stapelton">old Stapleton airfield</a> with the north side.</p>
<p>But this time, it’s not 747s or DC-10s that will go over top of I-70 traffic, but <a href="http://discover.stapletondenver.com/#/discover">Stapleton neighborhood</a> residents, regional shoppers and other highway travelers.</p>
<p><a href="http://denvergov.org/Capital_Projects_Center/CentralParkBoulevardInterchange/ProjectHistory/tabid/434407/Default.aspx">The new interchange will carry the Stapleton neighborhood’s Central Park Boulevard</a> over I-70 to N<a href="http://www.northfieldstapleton.com/">orthfield Boulevard in the growing commercial area</a> where Stapleton’s two old north-south runways used to be.</p>
<p>The project is being done by <a href="http://www.semaconstruction.com/">SEMA Construction</a> and <a href="http://www.wilsonco.com/">Wilson and Company</a> under a design-build contract with Denver. In January, SEMA was given the Notice to Proceed, and the design phase is at 40 percent completion, according to Steven Coggins, Denver&#8217;s project manager. Construction is expected to start in June with completion anticipated by October 2011.</p>
<div id="attachment_4548" class="wp-caption alignleft" style="width: 580px"><a href="http://milepost61.files.wordpress.com/2010/03/stapletontunnel.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/03/Rotator-Stapleton-Runway-Tunnel-I-70-570x285.jpg" alt="A TWA jet is on take-off from Stapleton&#039;s old Runway 35 crossing I-70. Several years later, a second north-south runway was added north of I-70 and a second tunnel-bridge was built next to this one for the access taxiway. Photo at Matt Salek&#039;s Milepost 61 blog." title="Rotator Stapleton Runway Tunnel I-70" width="570" height="285" class="size-large wp-image-4548" /></a><p class="wp-caption-text">A TWA jet is on take-off from Stapleton's old Runway 35 crossing I-70. Several years later, a second north-south runway was added north of I-70 and a second tunnel-bridge was built next to this one for the access taxiway. Photo at Matt Salek's Milepost 61 blog.</p></div>
<p>The project is using a mix of funding sources including the city’s <a href="http://denvergov.org/Default.aspx?alias=denvergov.org/betterdenver">Better Denver bond program</a>, which is providing up to $30 million.</p>
<p>It is also using $12 million in federal stimulus funds through the <a href="http://www.recovery.gov/Pages/home.aspx">American Recovery and Reinvestment Act</a> competitive grants program, channeled through the <a href="http://www.drcog.org/index.cfm">Denver Regional Council of Governments</a>; and $8 million in other federal transportation funding.</p>
<p>And this week, the <a href="http://www.coloradodot.info/about/transportation-commission">Colorado Transportation Commission </a>is expected to approve an application for $1 million in earmarked Interstate Maintenance funds from the Federal Highway Administration to add the replacement of 800 feet of dilapidated concrete on the ramp from westbound I-70 to <a href="http://www.mesalek.com/colo/r200-233.html#i225">Interstate 270</a> to the project. The new ramps tied into this segment but initially it was going to be left as-is. </p>
<p>The <a href="http://www.coloradodot.info/">Colorado Department of Transportation</a>, which controls I-70, is providing oversight.</p>
<div id="attachment_4445" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/03/Stapleton-I-70-4.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/03/Stapleton-I-70-4-570x186.jpg" alt="Rendering from Denver&#039;s interchange study shows the conceptual layout of the wide bridge planned for Central Park Boulevard over I-70. Ramps from and to I-270 straddle I-70 under the bridge." title="Stapleton I-70 4" width="570" height="186" class="size-large wp-image-4445" /></a><p class="wp-caption-text">Rendering from Denver's interchange study shows the conceptual layout of the wide bridge planned for Central Park Boulevard over I-70. Ramps from and to I-270 straddle I-70 under the bridge.</p></div>The design includes a lot of new ramps as it seeks to bring enhanced mobility to this area. Currently, drivers zipping through Stapleton on I-70 face a circuitous route to get into the development on either side of the highway. They can exit westbound at Havana Street or Quebec Street, then go north to 47th Avenue or Northfield Boulevard; or south to Martin Luther King Boulevard or 36th Avenue.</p>
<p>The “spaghetti” of ramps will allow drivers direct access into both sides of Stapleton via a new Central Park Boulevard bridge, which will cross I-70 just to the east of the existing airport cargo bridge. That is the only bridge over the highway left from Stapleton’s airport days, but it was not adequate for re-use. Central Park Boulevard’s bridge will be between the cargo bridge and the spot where old Runway 17R-35L used to cross over on a long bridge that formed a tunnel carrying I-70. Just to the east of that spot, there used to be a second I-70 tunnel over which a taxiway to Runway 17L-35R was located.</p>
<p>While development of the Stapleton neighborhood has pretty much erased traces of the old runways south of I-70, there are still vestiges of them remaining on the north side.</p>
<p>The Stapleton developer, Forest City Enterprises, will spend an additional amount up to $20 million to construct the extension of Central Park Boulevard from 36th Avenue to Northfield Boulevard.</p>
<p>The design includes two <a href="http://www.youtube.com/watch?v=SlXSOnPqPGE">“braided” style ramps</a>, which allow traffic to and from I-270 to cross over entrance and exit ramps from I-70 to Central Park Boulevard. Braided ramps lift one flow of traffic over another to let them change sides without conflict.</p>
<p>While more expensive to build, braided ramps are much safer than old-style “weave lanes” in which traffic trying to merge left onto a freeway had to compete with traffic merging right to get off. Recently constructed examples are at southbound Interstate 25 and Speer Boulevard, and northbound I-25 at Belleview Avenue/Interstate 225.</p>
<p><div id="attachment_4419" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/03/Stapleton-I-70-5.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/03/Stapleton-I-70-5-570x450.jpg" alt="Old CDOT photo shows then-new I-70 tunnel going under Stapleton Airport&#039;s Runway 17-35. Later, a second tunnel was built for the highway, closer to front of photo, for a taxiway to a new runway on the north airfield." title="Stapleton I-70 5" width="570" height="450" class="size-large wp-image-4419" /></a><p class="wp-caption-text">Old CDOT photo shows then-new I-70 tunnel going under Stapleton Airport's Runway 17-35. Later, a second tunnel was built for the highway, closer to front of photo, for a taxiway to a new runway on the north airfield.</p></div>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/17/sema-begins-work-on-i-70-design-build-stapleton-interchange/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Vail Daily: Improving Eagle County half of Cottonwood Pass as Glenwood Canyon bypass would be $47 million minimum</title>
		<link>http://www.inside-lane.com/2010/03/16/vail-daily-improving-eagle-county-half-of-cottonwood-pass-as-glenwood-canyon-bypass-would-be-47-million-minimum/</link>
		<comments>http://www.inside-lane.com/2010/03/16/vail-daily-improving-eagle-county-half-of-cottonwood-pass-as-glenwood-canyon-bypass-would-be-47-million-minimum/#comments</comments>
		<pubDate>Wed, 17 Mar 2010 03:56:50 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[Cottonwood Pass]]></category>
		<category><![CDATA[Eagle County]]></category>
		<category><![CDATA[Glenwood Canyon]]></category>
		<category><![CDATA[Glenwood Springs]]></category>
		<category><![CDATA[Gypsum]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4404</guid>
		<description><![CDATA[The <em>Vail Daily</em> reports that improving the gravel road up Cottonwood Pass between Gypsum and Glenwood Springs as an alternative route to Interstate 70 through Glenwood Canyon would cost from $47 million to $66 million – and that’s only for the 15 miles in Eagle County to the summit. The other 10 miles into Glenwood would add to that.]]></description>
			<content:encoded><![CDATA[<p><a href="http://www.vaildaily.com/article/20100316/NEWS/100319667/1078&#038;ParentProfile=1062">The <em>Vail Daily</em> reports</a> that improving the gravel road up Cottonwood Pass between Gypsum and Glenwood Springs as an alternative route to Interstate 70 through Glenwood Canyon would cost from $47 million to $66 million – and that’s only for the 15 miles in Eagle County to the summit.</p>
<p>The other 10 miles into Glenwood would add to that.</p>
<p>The costs make it impractical to bring the road up to highway standards, county officials said.</p>
<p><a href="http://www.vaildaily.com/article/20100316/NEWS/100319667/1078&#038;ParentProfile=1062">Go to the <em>Vail Daily</em> to see the entire article and a map of the pass.</a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/16/vail-daily-improving-eagle-county-half-of-cottonwood-pass-as-glenwood-canyon-bypass-would-be-47-million-minimum/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Summit County Citizens Voice: Feds want I-70 environmental study rewritten, re-released</title>
		<link>http://www.inside-lane.com/2010/03/12/summit-county-citizens-voice-feds-want-i-70-environmental-study-rewritten-re-released/</link>
		<comments>http://www.inside-lane.com/2010/03/12/summit-county-citizens-voice-feds-want-i-70-environmental-study-rewritten-re-released/#comments</comments>
		<pubDate>Sat, 13 Mar 2010 01:08:06 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[Federal Highway Administration]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 70]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4360</guid>
		<description><![CDATA[<a href="http://summitcountyvoice.com/2010/03/12/feds-want-user-friendly-version-of-i-70-study/#more-4072">The Summit County Citizens Voice reports</a> that the Federal Highway Administration, concerned about compliance with environmental laws, has asked CDOT to rewrite the Programmatic Environmental Impact Statement for the I-70 Mountain Corridor in a more “citizen-friendly” format.

The 2,500-page document would then be re-released toward the end of this year.

“Two weeks ago, the feds came in and said they don’t like the way it’s going with regard to NEPA,” said Penny, referring to the National Environmental Policy Act, an over-riding federal law that outlines how environmental studies are conducted and the rules for public involvement.”

<a href="http://summitcountyvoice.com/2010/03/12/feds-want-user-friendly-version-of-i-70-study/#more-4072">Go to the Summit County Citizens Voice to see the entire item</a>.]]></description>
			<content:encoded><![CDATA[<p><a href="http://summitcountyvoice.com/2010/03/12/feds-want-user-friendly-version-of-i-70-study/#more-4072">The Summit County Citizens Voice reports</a> that the Federal Highway Administration, concerned about compliance with environmental laws, has asked CDOT to rewrite the Programmatic Environmental Impact Statement for the I-70 Mountain Corridor in a more “citizen-friendly” format.</p>
<p>The 2,500-page document would then be re-released toward the end of this year.</p>
<p>“Two weeks ago, the feds came in and said they don’t like the way it’s going with regard to NEPA,” said Penny, referring to the National Environmental Policy Act, an over-riding federal law that outlines how environmental studies are conducted and the rules for public involvement.”</p>
<p><a href="http://summitcountyvoice.com/2010/03/12/feds-want-user-friendly-version-of-i-70-study/#more-4072">Go to the Summit County Citizens Voice to see the entire item</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/12/summit-county-citizens-voice-feds-want-i-70-environmental-study-rewritten-re-released/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

