<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Kevin Flynn&#039;s Inside Lane &#187; bridges</title>
	<atom:link href="http://www.inside-lane.com/tag/bridges/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.inside-lane.com</link>
	<description>News and commentary about Colorado transportation</description>
	<lastBuildDate>Fri, 23 Apr 2010 15:04:54 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Denver Transit Construction Group: Details of FasTracks West Corridor steel-arch bridge roll-out over Sixth Avenue</title>
		<link>http://www.inside-lane.com/2010/04/16/denver-transit-construction-group-details-of-fastracks-west-corridor-steel-arch-bridge-roll-out-over-sixth-avenue/</link>
		<comments>http://www.inside-lane.com/2010/04/16/denver-transit-construction-group-details-of-fastracks-west-corridor-steel-arch-bridge-roll-out-over-sixth-avenue/#comments</comments>
		<pubDate>Fri, 16 Apr 2010 22:09:11 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[Denver Transit Construction Group]]></category>
		<category><![CDATA[FasTracks]]></category>
		<category><![CDATA[Regional Transportation District]]></category>
		<category><![CDATA[RTD]]></category>
		<category><![CDATA[Transit]]></category>
		<category><![CDATA[West Corridor]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4813</guid>
		<description><![CDATA[The RTD FasTracks West Corridor team will roll out the main span of a double-track light rail bridge across 6th Avenue just east of Simms/Union the weekend of April 23rd through April 25th. All lanes of 6th Avenue between Simms/Union and Kipling Street will close at 8:00 p.m. on Friday, April 23rd to prepare the area for the roll-out, scheduled to begin early Saturday morning. 6th Avenue and the frontage road will re-open by 5:30 a.m. Monday, April 26th.]]></description>
			<content:encoded><![CDATA[<p><strong>Denver Transit Construction Group Media Release</p>
<p>FasTracks West Corridor to roll out signature bridge across 6th Avenue<br />
Innovative construction technique saves months of traffic impacts</strong> </p>
<p>Lakewood, April 16, 2010 – The RTD FasTracks West Corridor team will roll out the main span of a double-track light rail bridge across 6th Avenue just east of Simms/Union the weekend of April 23rd through April 25th. All lanes of 6th Avenue between Simms/Union and Kipling Street will close at 8:00 p.m. on Friday, April 23rd to prepare the area for the roll-out, scheduled to begin early Saturday morning. 6th Avenue and the frontage road will re-open by 5:30 a.m. Monday, April 26th. </p>
<p>For the past several months, crews have been assembling the steel tied arch structure along the south side of the highway. Now, crews will transport the bridge into its final position over the highway via a large dolly consisting of two 35’ platforms with eight axles each. The arch will travel on guided rollers which are pushed by hydraulic rams capable of up to 270,000 pounds per square inch of force. At speeds ranging from 10 to 25 feet per hour, the actual roll-out is expected to take up to 30 hours for the bridge to connect with the north span already in place across the north 6th Avenue Frontage Road. </p>
<p>Had the structure been built over 6th Avenue, traveling motorists would have endured months of lane closures and traffic congestion. This approach to bridge construction enabled West Corridor crews to work in a safe environment outside of traffic and significantly minimize impacts to commuters using the 6th Avenue freeway. </p>
<p>“If the bridge had been constructed in place over the highway, we would have had to impact traffic on 6th Avenue many times over the course of construction instead of just one weekend as we are doing,” said Jim Starling, RTD’s West Corridor Project Manager. “This is a much more efficient process that minimizes inconvenience to the traveling public.” </p>
<p>The 12.1-mile West Corridor light rail project is the first rail line of RTD’s FasTracks program to start construction. The West Corridor line will operate between Denver Union Station in downtown Denver and the Jefferson County Government Center in Golden; serving Denver, Lakewood, the Denver Federal Center, Golden and Jefferson County. The corridor is scheduled to open to the public in 2013. </p>
<p>FasTracks is RTD’s voter-approved transit program to expand rail and bus service throughout the RTD service area. FasTracks will build 122 miles of commuter rail and light rail, 18 miles of bus rapid transit service, add 21,000 new parking spaces, redevelop Denver Union Station and redirect bus service to better connect the eight-county District. The FasTracks investment initiative is projected to create more than 10,000 jobs during the height of construction, and will pump billions of dollars into the regional economy.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/16/denver-transit-construction-group-details-of-fastracks-west-corridor-steel-arch-bridge-roll-out-over-sixth-avenue/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT: Bridge demoliton at 104th Avenue requires several I-25 closures and restrictions</title>
		<link>http://www.inside-lane.com/2010/04/16/cdot-bridge-demoliton-at-104th-avenue-requires-several-i-25-closures-and-restrictions/</link>
		<comments>http://www.inside-lane.com/2010/04/16/cdot-bridge-demoliton-at-104th-avenue-requires-several-i-25-closures-and-restrictions/#comments</comments>
		<pubDate>Fri, 16 Apr 2010 19:23:20 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[I-25]]></category>
		<category><![CDATA[Interstate 25]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4809</guid>
		<description><![CDATA[The Colorado Department of Transportation (CDOT) recently completed the center portion of the new 104th Avenue bridge over I-25.  With two thirds of the new bridge complete, crews will be realigning eastbound 104th Avenue onto the new bridge this week and demolishing the final third of the existing bridge. As a result of the upcoming bridge demolition, there will be various lane closures on 104th Avenue as well as I-25 next week. ]]></description>
			<content:encoded><![CDATA[<p><strong>CDOT Media Release</p>
<p>Bridge Demolition to Close I-25 Near 104TH Avenue Next Week</strong></p>
<p>ADAMS COUNTY – The Colorado Department of Transportation (CDOT) recently completed the center portion of the new 104th Avenue bridge over I-25.  With two thirds of the new bridge complete, crews will be realigning eastbound 104th Avenue onto the new bridge this week and demolishing the final third of the existing bridge.   </p>
<p>“We have now completed two thirds of the new structure and will be removing all traffic from the old bridge this week,” said CDOT Program Engineer John Schwab.  “With traffic realigned to the new structure, we can demolish and replace the southern portion of the bridge.”</p>
<p>As a result of the upcoming bridge demolition, there will be various lane closures on 104th Avenue as well as I-25 next week.  The following closures will take place Sunday, April 18th through Thursday, April 22nd, weather permitting:<br />
•	<strong>Sunday, April 18th:  </strong>All left turn movements from northbound and southbound I-25 to 104th Avenue and from eastbound and westbound 104th Avenue to I-25 will be prohibited from 12 a.m. until 5 p.m. on Sunday for paving.<br />
•	<strong>Monday, April 19th: </strong>A single lane of southbound I-25 at 104th Avenue will be closed at 7 p.m. followed by a full closure from 9 p.m. to 1 a.m.  In addition, all lanes of northbound I-25 at 104th Avenue will be closed from 1 a.m. to 5:30 a.m. on Tuesday morning. Crews will be removing a fence on the 104th Avenue bridge over I-25. Detour: Motorists will be detoured via the on and off ramps at 104th Avenue. Uniformed traffic control will be used to direct motorists through the interchange.<br />
•	<strong>Tuesday, April 20th:</strong> The left lane and left turn lane to I-25 will be closed on eastbound and westbound 104th Avenue from 8:30 p.m. to 5:30 a.m. to allow crews to realign eastbound 104th Avenue onto the new bridge.<br />
•	<strong>Wednesday, April 21st and Thursday, April 22nd:</strong> One lane of northbound and southbound I-25 at 104th Avenue will be closed at 7 p.m. with all lanes closing at 9 p.m. for bridge demolition.  All lanes will reopen by 5:30 a.m. the following day.  Detour: Motorists will be detoured via the on and off ramps at 104th Avenue. Uniformed traffic control will be used to direct motorists through the interchange.  </p>
<p>Major delays are throughout the week and alternate routes are strongly advised.  CDOT would like to remind motorists to obey all traffic signs and flaggers and to “Slow for the Cone Zone.”</p>
<p>The existing 104th Avenue bridge over I-25 was originally constructed in 1962 and is one of Colorado’s structurally deficient bridges.  When complete, the new bridge will accommodate an additional left turn lane from eastbound 104th Avenue to northbound I-25. </p>
<p>Hamon Contractors, Inc. is the contractor for this $6.5 million project scheduled to be complete by the end of January 2011.  CDOT is funding the bridge replacement and the Northglenn Urban Renewal Authority (NURA) is funding the aesthetic improvements which will include upgraded bridge rail and upgraded bridge lighting similar to the existing lighting on the 112th Avenue overpass bridge. Aesthetic improvements also include cornerstone monuments at the four ends of the bridge and &#8220;Northglenn&#8221; monument signage mounted to an upgraded retaining wall.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/16/cdot-bridge-demoliton-at-104th-avenue-requires-several-i-25-closures-and-restrictions/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>WCAX TV: Colorado&#8217;s Flatiron Construction is apparent low bidder to build replacement Lake Champlain bridge</title>
		<link>http://www.inside-lane.com/2010/04/15/flatiron-crown-point-bridge/</link>
		<comments>http://www.inside-lane.com/2010/04/15/flatiron-crown-point-bridge/#comments</comments>
		<pubDate>Fri, 16 Apr 2010 01:38:21 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[Flatiron Construction]]></category>
		<category><![CDATA[Vermont DOT]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4779</guid>
		<description><![CDATA[WCAX TV in Burlington, Vt., reports that Flatiron Construction of Lafayette is the apparent low bidder to build the new Crown Point bridge across an arm of Lake Champlain to connect New York and Vermont.

The old bridge was brought down by controlled demolition in December after inspectors closed it due to its condition becoming unsafe.

Flatiron’s bid was around $69 million. There were nine bidders on the project, none from Vermont. Vermont Department of Transportation officials stressed this was an apparent low bidder but Flatiron will not be awarded the contract until the bid is fully vetted.]]></description>
			<content:encoded><![CDATA[<div id="attachment_4783" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/Crown-Point-Bridge.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/Crown-Point-Bridge-570x320.jpg" alt="Rendering of the new bridge over Lake Champlain between West Addison, Vt., and Crown Point, N.Y." title="Crown Point Bridge" width="570" height="320" class="size-large wp-image-4783" /></a><p class="wp-caption-text">Rendering of the new bridge over Lake Champlain between West Addison, Vt., and Crown Point, N.Y.</p></div>
<p><a href="http://www.wcax.com/Global/story.asp?S=12319613">WCAX TV in Burlington, Vt., reports</a> that Flatiron Construction of Lafayette is the apparent low bidder to build the new Crown Point bridge across an arm of Lake Champlain to connect New York and Vermont.</p>
<p>The old bridge was brought down by controlled demolition in December after inspectors closed it due to its condition becoming unsafe.</p>
<p>Flatiron’s bid was around $69 million. There were nine bidders on the project, none from Vermont. Vermont Department of Transportation officials stressed this was an apparent low bidder but Flatiron will not be awarded the contract until the bid is fully vetted.</p>
<p><a href="http://www.wcax.com/Global/story.asp?S=12319613">Go to WCAX.com to see the entire story</a>.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/15/flatiron-crown-point-bridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT: Repairs to I-25 northbound bridge over Santa Fe requires lane closures</title>
		<link>http://www.inside-lane.com/2010/04/15/cdot-repairs-to-i-25-northbound-bridge-over-santa-fe-requires-lane-closures/</link>
		<comments>http://www.inside-lane.com/2010/04/15/cdot-repairs-to-i-25-northbound-bridge-over-santa-fe-requires-lane-closures/#comments</comments>
		<pubDate>Fri, 16 Apr 2010 01:23:43 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[I-25]]></category>
		<category><![CDATA[Interstate 25]]></category>
		<category><![CDATA[safety]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4777</guid>
		<description><![CDATA[In a recent bridge inspection that took place earlier this week, Colorado Department of Transportation (CDOT) bridge engineers determined that portions of the northbound I-25 bridge deck over Santa Fe Drive need to be rehabilitated due to deteriorating concrete.

The repairs include removing the existing asphalt, removing the deteriorated concrete, replacing the bridge deck with new concrete, paving, and striping.  The majority of the repairs will take place in the right lane of northbound I-25 with additional work taking place in the other lanes of northbound I-25 over Santa Fe Drive.]]></description>
			<content:encoded><![CDATA[<p><strong>CDOT Traffic Advisory</p>
<p>CDOT to begin bridge deck repairs on northbound I-25 over Santa Fe Drive</p>
<p>Bridge Deck Rehabilitation to Follow in the Near Future</strong></p>
<p>DENVER – In a recent bridge inspection that took place earlier this week, Colorado Department of Transportation (CDOT) bridge engineers determined that portions of the northbound I-25 bridge deck over Santa Fe Drive need to be rehabilitated due to deteriorating concrete.</p>
<p>The repairs include removing the existing asphalt, removing the deteriorated concrete, replacing the bridge deck with new concrete, paving, and striping.  The majority of the repairs will take place in the right lane of northbound I-25 with additional work taking place in the other lanes of northbound I-25 over Santa Fe Drive.</p>
<p>Prior to the bridge deck rehabilitation, starting tonight, crews will begin making immediate repairs by shoring the I-25 bridge deck to prevent concrete from falling onto Santa Fe Drive from the bridge above.  As a result, up to two lanes of southbound Santa Fe Drive will be closed tonight, April 15th, from 8 p.m. to 5:30 a.m.  Additional lane closures may be required during the same hours tomorrow night if crews cannot complete the shoring tonight. I-25 should not be impacted by this work.</p>
<p>The bridge deck rehabilitation will begin once CDOT has secured a contractor to do this work. This work will likely impact traffic on northbound I-25 as well as both directions of Santa Fe Drive at some point in the near future.  A plan for how this work will be completed, when and the cost of the rehabilitation is still under development.</p>
<p>The northbound and southbound I-25 bridges over Santa Fe Drive were both constructed in 1958 and are two of Colorado’s structurally deficient bridges in poor condition. The stretch of I-25 carries over 200,000 vehicles a day.</p>
<p>CDOT is in the process of designing a project that will ultimately replace both I-25 bridges over Santa Fe Drive.  The project is estimated to cost between $65 and $75 million, however a schedule for replacing these bridges has not yet been determined.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/15/cdot-repairs-to-i-25-northbound-bridge-over-santa-fe-requires-lane-closures/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Telluride Watch: US 550 bridge replacement at Bear Creek to begin in August with FASTER funding</title>
		<link>http://www.inside-lane.com/2010/04/15/telluride-watch-us-550-bridge-replacement-at-bear-creek-to-begin-in-august/</link>
		<comments>http://www.inside-lane.com/2010/04/15/telluride-watch-us-550-bridge-replacement-at-bear-creek-to-begin-in-august/#comments</comments>
		<pubDate>Thu, 15 Apr 2010 17:34:19 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[FASTER]]></category>
		<category><![CDATA[Highways]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4770</guid>
		<description><![CDATA[The <em>Telluride Watch</em> reports that drivers who regularly use Red Mountain Pass can expect major road construction starting this August when the Colorado Department of Transportation will begin a $5.7 million Bear Creek Bridge replacement project on U.S. Hwy. 550 south of Ouray.

Phase I of the project is expected to begin on Aug. 1 and end approximately Nov. 1, CDOT Region 5 Resident Engineer Ed Archuleta told the Ouray County Commissioners on Monday. ]]></description>
			<content:encoded><![CDATA[<div id="attachment_504" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2009/08/102_5271.JPG"><img src="http://www.inside-lane.com/wp-content/uploads/2009/08/102_5271-570x427.jpg" alt="The oldest bridge on the FASTER list for replacement is the nearly 90-year-old cliff-hugging Million Dollar Highway bridge over Bear Creek Falls near Ouray. Inside Lane photo." title="US 550 Bear Creek Bridge" width="570" height="427" class="size-large wp-image-504" /></a><p class="wp-caption-text">The oldest bridge on the FASTER list for replacement is the nearly 90-year-old cliff-hugging Million Dollar Highway bridge over Bear Creek Falls near Ouray. Inside Lane photo.</p></div>
<p>The <em>Telluride Watch</em> reports that drivers who regularly use Red Mountain Pass can expect major road construction starting this August when the Colorado Department of Transportation will begin a $5.7 million Bear Creek Bridge replacement project on U.S. Hwy. 550 south of Ouray.</p>
<p>Phase I of the project is expected to begin on Aug. 1 and end approximately Nov. 1, CDOT Region 5 Resident Engineer Ed Archuleta told the Ouray County Commissioners on Monday. </p>
<p>Go to the <em>Telluride Watch</em> to see the entire report.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/15/telluride-watch-us-550-bridge-replacement-at-bear-creek-to-begin-in-august/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>$25.3 million in state bridge and road projects moving through FASTER pipeline</title>
		<link>http://www.inside-lane.com/2010/04/15/25-3-million-in-state-bridge-and-road-projects-moving-through-faster-pipeline/</link>
		<comments>http://www.inside-lane.com/2010/04/15/25-3-million-in-state-bridge-and-road-projects-moving-through-faster-pipeline/#comments</comments>
		<pubDate>Thu, 15 Apr 2010 10:00:45 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Highways]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[FASTER]]></category>
		<category><![CDATA[transportation funding]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4751</guid>
		<description><![CDATA[A total of $25.3 million in state highway projects funded by the FASTER program is in CDOT’s pipeline, including replacement of four wooden bridges along a state highway where volunteer firefighters died in 2008 crossing where a fifth wooden bridge had been destroyed in a wildfire.]]></description>
			<content:encoded><![CDATA[<div id="attachment_4756" class="wp-caption alignleft" style="width: 310px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CO-96-B-over-Draw.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CO-96-B-over-Draw-300x203.jpg" alt="CO 96 wood timber bridge over draw in Kiowa County, 3.3 miles east of Crowley County line." title="CO 96 B over Draw" width="300" height="203" class="size-medium wp-image-4756" /></a><p class="wp-caption-text">CO 96 wood timber bridge over draw in Kiowa County, 3.3 miles east of Crowley County line.</p></div>
<p><em>By Kevin Flynn<br />
Inside-Lane.com</em></p>
<p>A total of $25.3 million in state highway projects funded by the <a href="http://www.leg.state.co.us/clics/clics2009a/csl.nsf/fsbillcont/636E40D6A83E4DE987257537001F8AD6?Open&#038;file=108_enr.pdf">FASTER program</a> is in CDOT’s pipeline, including replacement of four wooden bridges along a state highway where volunteer firefighters died in 2008 crossing where a fifth wooden bridge had been destroyed in a wildfire.</p>
<p>The 10 separate projects include $8.2 million in bridge replacements and $17.1 million in road safety work.</p>
<p>The list includes those under contract, those with bids already taken and those currently out for bids.</p>
<p>FASTER, which stands for Funding Advancement for Surface Transportation and Economic Recovery, was passed by the legislature last year. It represents the first new local funding to come in to state transportation projects in 19 years, since the gas tax was last increased. Some of FASTER&#8217;s revenue is allocated to cities and counties for local roads.</p>
<p>FASTER established two separate fees, earmarked to road safety projects and to replacement of the 124 poor-rated bridges on the state highway network.</p>
<p>The annual road safety fee is a sliding scale based on vehicle weight. Ranging from $16 for light vehicles to $39 for vehicles over eight tons, the owner of the average passenger car between one and two and a half tons would pay $23.</p>
<p>The bridge fee is also a sliding scale based on weight, and is being phased in over three years. Currently at $9 for the average passenger car, it will be $18 in two more years.</p>
<p>As a result, the owner of an average passenger car would pay $41 in 2011-12 between the two fees.</p>
<p><a href="http://www.inside-lane.com/2009/11/16/faster-auto-fees-replacing-four-wooden-bridges-on-co-96-where-volunteer-firefighters-died/">Among the bridges being replaced this year are four wooden structures on CO 96</a> in Crowley and Kiowa counties in southeast Colorado. It was on this corridor that a fifth wooden bridge west of Ordway burned in the grassfires of April 2008, and a fire truck from the Olney Springs volunteers rushing to help protect Ordway plunged over the abutment and into the Numa Drain Canal. Two firefighters died in the crash. The structures had been built in the 1930s and 1940s.</p>
<p>Here is the list of FASTER projects currently in the process of contracting:</p>
<p>FASTER Safety Projects</p>
<p>Under contract:<br />
•	I-70 between the Eisenhower Tunnel and Bakerville: Upgrades median barrier and resurfaces I-70. Asphalt Specialties, $2,955,811.15<br />
•	I-25 between approximately CO 392 and Harmony Road: Rubblizes and repairs failing concrete on I-25. Coulson Excavating, $9,384,771.55</p>
<p>Bids received:<br />
•	I-70 between Eisenhower Tunnel and Silverthorne: Installs electronic signage to manage truck speeds and the westbound runaway truck ramp. Sturgeon Electric, $577,954<br />
•	I-70 at Georgetown Hill: Installs electronic signage to warn motorists of slow moving or stopped traffic. Sturgeon Electric, $122,513<br />
•	US 285 between Bailey and Richmond Hill: Paves US 285 in asphalt, installs guardrail, improves lane transitions at the end of the existing climbing lanes and widens shoulders. LaFarge North American, dba LaFarge West Inc., $2,662,412.20</p>
<p>Currently under ad for bids:<br />
•	CO 93 at CO 170, Eldorado Springs: Upgrades the traffic signal at the intersection. Engineer’s estimate, $330,000<br />
•	CO 392 at Weld County Road 31: Installs a new traffic signal at the intersection. Engineer’s estimate, $300,000<br />
•	I-76 near Hudson: Installs median cable guardrail to help prevent crossover accidents.- Engineer’s estimate, $750,000</p>
<p>FASTER Bridge Projects<br />
•	CO 69 over Turkey Creek: Bridge replacement. Engineer’s estimate, $3 million<br />
•	CO 96 over Draw and Black Draw: Replaces four bridges. Engineer’s estimate, $5.2 million</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/15/25-3-million-in-state-bridge-and-road-projects-moving-through-faster-pipeline/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT: Pueblo 4th Street Bridge project has major traffic switch coming on Friday</title>
		<link>http://www.inside-lane.com/2010/04/14/cdot-pueblo-4th-street-bridge-project-has-major-traffic-switch-coming-on-friday/</link>
		<comments>http://www.inside-lane.com/2010/04/14/cdot-pueblo-4th-street-bridge-project-has-major-traffic-switch-coming-on-friday/#comments</comments>
		<pubDate>Thu, 15 Apr 2010 03:46:38 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[Pueblo]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4749</guid>
		<description><![CDATA[The Colorado Department of Transportation (CDOT) is getting ready to move all traffic on the current 4th Street Bridge onto the new westbound structure by 7 a.m. on Friday, April 16. 

Drivers should expect occasional traffic stops and delays up to 10 minutes through the area on Thursday as preparations are made for the realignment.]]></description>
			<content:encoded><![CDATA[<p><strong>CDOT Traffic Advisory</p>
<p>4th Street Bridge Advisory &#8211; Major Traffic Switch Friday Morning</strong> </p>
<p>April 14, 2010 &#8211; Southeastern Colorado/CDOT Region 2 &#8211; PUEBLO &#8211; The Colorado Department of Transportation (CDOT) is getting ready to move all traffic on the current 4th Street Bridge onto the new westbound structure by 7 a.m. on Friday, April 16. </p>
<p>Drivers should expect occasional traffic stops and delays up to 10 minutes through the area on Thursday as preparations are made for the realignment.</p>
<p>Traffic is being moved to allow the eastbound bridge to be demolished over the next four to six weeks.  In addition:<br />
•	Eastbound and westbound traffic will remain in a single-lane configuration on the new bridge<br />
•	No left turns will be allowed at the Elmhurst Place/Pearl Street intersection while construction is taking place near the west end of the bridge<br />
•	Pedestrians access will be limited to the new, north sidewalk on 4th Street due to demolition of the old bridge<br />
•	Traffic will be traveling on an unfinished road surface and may experience bumps, which will be removed when final paving is completed later this year<br />
•	Shoulder closures will remain on the new westbound bridge, allowing access for eastbound bridge construction<br />
•	The loop ramp from eastbound 4th Street to Midtown Center will remain closed until bridge demolition is complete<br />
•<br />
In addition, CDOT has closed the Arkansas River Trail under the bridges to maintain safety for pedestrians and bicyclists.  It is scheduled to reopen on June 1, 2010.</p>
<p>The new eastbound bridge is expected to open to traffic in its final configuration in December 2010.  Landscaping and other finishing work will take place in spring 2011, with project completion scheduled for summer 2011. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/14/cdot-pueblo-4th-street-bridge-project-has-major-traffic-switch-coming-on-friday/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT ready to roll on $390 million in road projects in metro Denver area</title>
		<link>http://www.inside-lane.com/2010/04/09/cdot-traffic-watchers-projects/</link>
		<comments>http://www.inside-lane.com/2010/04/09/cdot-traffic-watchers-projects/#comments</comments>
		<pubDate>Fri, 09 Apr 2010 10:00:01 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Featured]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[ARRA]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[C-470]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[I-225]]></category>
		<category><![CDATA[I-25]]></category>
		<category><![CDATA[I-70]]></category>
		<category><![CDATA[Interstate 25]]></category>
		<category><![CDATA[Interstate 70]]></category>
		<category><![CDATA[US 36]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4659</guid>
		<description><![CDATA[<img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-CO7-570x405.jpg" alt="The new CO 7 bridge being built by Zak Dirt Inc. over the South Platte River in Brighton is nearly complete. CDOT photo." title="CDOT Traffic Watchers CO7" width="380" class="size-large wp-image-4678" />

More than $390 million in road construction projects on state highways will be underway this year in the metro Denver area, with more than a third of the total funded by the federal stimulus program.]]></description>
			<content:encoded><![CDATA[<div id="attachment_4683" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/Rotator-CDOT-Traffic-Watchers-104th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/Rotator-CDOT-Traffic-Watchers-104th-Ave-570x285.jpg" alt="Hamon Contractors is building the middle segment of the new 104th Avenue bridge in Northglenn, replacing an original I-25 bridge from 1962. CDOT photo." title="Rotator CDOT Traffic Watchers 104th Ave" width="570" height="285" class="size-large wp-image-4683" /></a><p class="wp-caption-text">Hamon Contractors is building the middle segment of the new 104th Avenue bridge in Northglenn, replacing an original I-25 bridge from 1962. CDOT photo.</p></div>
<p><em>By Kevin Flynn<br />
Inside-Lane.com</em></p>
<p><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/Traffic-Watchers-Briefing-2010-Spring-Summer.pdf">More than $390 million in road construction projects</a> on state highways will be underway this year in the metro Denver area, with more than a third of the total funded by the federal stimulus program.</p>
<p>The activity is spread across 32 projects in the <a href="http://www.dot.state.co.us/region-6/">Colorado Department of Transportation’s Region 6</a>, which covers much of the Denver area with the exception of Boulder and Douglas County south of Highlands Ranch. It includes projects <a href="http://www.coloradodot.info/">CDOT </a>is doing plus several city projects in Denver and Aurora on state highways that CDOT is overseeing.</p>
<p><a href="http://www.coloradodot.info/about/regions.html">CDOT’s Region 6 staff led by Region Director Reza Akhavan</a> outlined the projects in a briefing that brought to light some of the savings achieved recently in bidding results that allowed budgeted funds to be plowed back into additional work.</p>
<p>“This will be keeping us very busy this year,” Akhavan said.</p>
<div id="attachment_4689" class="wp-caption alignright" style="width: 310px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Aerial.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Aerial-300x451.jpg" alt="CDOT aerial photo shows grading work at the 120th Avenue Connection project over US 36, looking southwest." title="CDOT Traffic Watchers 120th Aerial" width="300" height="451" class="size-medium wp-image-4689" /></a><p class="wp-caption-text">CDOT aerial photo shows grading work at the 120th Avenue Connection project over US 36, looking southwest.</p></div>
<p>Foremost was savings in the $23.3 million <a href="http://www.coloradodot.info/projects/120AvenueConnection">120th Avenue Connection</a> project in Broomfield, which is providing a straight-across link west-to-east from <a href="http://www.mesalek.com/colo/r120-139.html#128">CO 128</a> to 120th Avenue to allow traffic to bypass the busy Wadsworth/Midway Boulevard interchange with U.S. 36. <a href="http://www.inside-lane.com/2009/09/24/23-million-design-build-job-starts-today-in-broomfield-to-connect-120th-avenue-over-u-s-36/">Inside Lane wrote about this project when ground was broken</a>, and at the time, CDOT didn’t have funding to start the second phase that would include the tie-ins on the east side with 120th.</p>
<p>Now, says CDOT Region 6 North Program Engineer John Schwab, savings achieved through the design-build contracting process used by CDOT and the contractor partnership of <a href="http://www.edkraemer.com/">Edward Kraemer &#038; Sons</a> and <a href="http://www.hntb.com/">HNTB </a>will allow CDOT to begin design work on that second phase, as well as right-of-way acquisition. The hefty construction costs for that phase, estimated up to $40 million, means the rest will have to wait for more funding.</p>
<p>They projects range from the inexpensive– such as a $180,000 paint restriping of Parker Road between Hampden and Belleview Avenues to fit in third lanes in each direction, a small price to squeeze out extra traffic capacity on the busy corridor, and $500,000 for a wildlife fence along U.S. 6 between Heritage Road and 19th Street in Golden – to several in the $30 million and $40 million class.</p>
<p>Because of the lead time to get stimulus-funded projects underway, there are many projects this construction season that are being funded by the <a href="http://www.recovery.gov/Pages/home.aspx">American Recovery and Reinvestment Act</a>. They include the $47.2 construction of a new <a href="http://www.inside-lane.com/2010/03/17/sema-begins-work-on-i-70-design-build-stapleton-interchange/">Central Park Boulevard interchange on Interstate 70 by SEMA Construction </a>to provide better access to Denver’s Stapleton neighborhood and commercial area, the $17.9 million addition of a 17th Avenue interchange on Interstate 225 by Hamon Contractors to ease traffic flows into the Fitzsimons medical campus in Aurora, the <a href="http://www.inside-lane.com/2009/11/17/new-alameda-bridge-over-i-25-to-solve-flooding-problem-and-kick-off-long-list-of-valley-highway-upgrades/">$36.9 million replacement of the Alameda bridge over I-25 in Denver by Jalisco International</a> and a <a href="http://www.inside-lane.com/2009/12/21/huge-santa-fe-flyover-ramp-at-c-470-out-for-bids-next-month-will-eliminate-left-turn-traffic-jams/">new $32 million flyover ramp for southbound Santa Fe Drive to eastbound C-470 by Edward Kraemer and Sons in Littleton</a>.</p>
<p>CDOT also will be starting up projects funded by the new revenue from the <a href="http://www.leg.state.co.us/clics/clics2009a/csl.nsf/fsbillcont/636E40D6A83E4DE987257537001F8AD6?Open&#038;file=108_enr.pdf">FASTER program’s</a> vehicle registration fee hikes. They include new signals, auxiliary lane and realignment of the roadway geometry at the hazardous intersection of CO 7 and York Street in Adams County, more median cable guards on C-470 to prevent crossover head-on crashes and concrete median barrier on South Santa Fe Drive in Littleton.</p>
<p>“While a few large Recovery Act projects are still underway, there are many projects that are just starting that will greatly improve safety and mobility on our highway system,” said CDOT Executive Director Russell George.  “Specifically, there will be several critical bridge and safety projects as a result of FASTER.”</p>
<p><strong><em>Use this map of CDOT&#8217;s Region 6 &#8212; most of the Denver Metro area &#8212; along with the project descriptions below to see where these projects are located. I have put all 32 projects below with details on cost, schedule, work hours and project scope, along with pictures from many of them:</strong></em></p>
<p><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Spring-2010-Map1.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Spring-2010-Map1-570x681.jpg" alt="CDOT Traffic Watchers Spring 2010 Map" title="CDOT Traffic Watchers Spring 2010 Map" width="570" height="681" class="alignleft size-large wp-image-4667" /></a><br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>Metro Denver CDOT Projects Spring-Summer 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
North Area (North Program Engineer John Schwab)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4682" class="wp-caption alignright" style="width: 348px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-120th-Ave.jpg" alt="Edward Kraemer and Sons has placed girders at the new 120th Avenue bridge over US 36 has girders and will soon install bridge decking. CDOT photo." title="CDOT Traffic Watchers 120th Ave" width="338" height="255" class="size-full wp-image-4682" /></a><p class="wp-caption-text">Edward Kraemer and Sons has placed girders at the new 120th Avenue bridge over US 36 has girders and will soon install bridge decking. CDOT photo.</p></div>1. 120th Avenue Connection</p>
<p>Cost:</strong> $23.3 million</p>
<p><strong>Contractor:</strong> Edward Kraemer and Sons, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Constructs a new six-lane road across US 36 to connect 120th Avenue and State Highway 128 in Broomfield in order to provide greater connectivity to US 36 and local roadways. This project will construct two of the three phases needed to complete the entire project. As part of this project, a new bridge over US 36 will be constructed as well as a new bridge over Commerce Street. Several local roads such as Commerce Street, Old Wadsworth Boulevard and 118th Avenue will be realigned to correspond with the new roadway. The RTD park-n-Ride facility at Wadsworth Parkway will be relocated near the Broomfield Event Center. Currently, motorists in the Broomfield area can only cross US 36 at Wadsworth Parkway. Due to the lack of continuity with State Highway 128 and 120th Avenue, the US 36/Wadsworth Parkway interchange is heavily congested and State Highway 128 and 120th Avenue are operating at capacity during peak hours. Traffic forecasts indicate at least a doubling in traffic over the next 20 years. The new 120th Avenue Connection will provide relief on these major corridors by improving connectivity, safety and mobility.</p>
<p><strong>Update: </strong>To date, crews have conducted embankment work on 120th Avenue and have begun bridge construction over US 36. Girders and bridge deck panels have been installed for the new bridge over US 36.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> September 2009 through October 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4681" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-104th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-104th-Ave-570x426.jpg" alt="Hamon Contractors is working on the middle segment of the new 104th Avenue bridge over I-25 in Northglenn. CDOT photo." title="CDOT Traffic Watchers 104th Ave" width="570" height="426" class="size-large wp-image-4681" /></a><p class="wp-caption-text">Hamon Contractors is working on the middle segment of the new 104th Avenue bridge over I-25 in Northglenn. CDOT photo.</p></div></p>
<p><strong>2. 104th Avenue over I-25</p>
<p>Cost:</strong> $6.5 million</p>
<p><strong>Contractor:</strong> Hamon Contractors, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Replaces the 104th Avenue bridge over I-25, which was originally constructed in 1962 and is one of Colorado’s structurally deficient bridges. The new bridge will be wider to accommodate an additional left turn lane from eastbound 104th Avenue to northbound I-25.</p>
<p><strong>Update:</strong> The new bridge is being constructed in three phases with work beginning on the northern portion. Currently, crews have completed the northern and middle portions of the new bridge and work will begin on the southern portion towards the end of April.</p>
<p><strong>Work Hours:</strong><br />
<em>I-25:</em> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 5:30 a.m. There will be occasional full closures of I-25 for girder installation, deck panel installation and bridge deck concrete pours.<br />
<em>104th Avenue:</em> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. with double lane closures Sunday through Thursday from 10 p.m. to 5:30 a.m. There will always one lane open in each direction.</p>
<p><strong>Duration:</strong> May 2009 through January 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4680" class="wp-caption alignright" style="width: 310px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-80th-Ave.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-80th-Ave-300x225.jpg" alt="The original 80th Avenue bridge over U.S. 36 was built in 1951 as part of the Denver-Boulder Turnpike. Structures Inc. will build the replacement. CDOT photo." title="CDOT Traffic Watchers 80th Ave" width="300" height="225" class="size-medium wp-image-4680" /></a><p class="wp-caption-text">The original 80th Avenue bridge over U.S. 36 was built in 1951 as part of the Denver-Boulder Turnpike. Structures Inc. will build the replacement. CDOT photo.</p></div><strong>3. 80th Avenue over US 36</p>
<p>Cost:</strong> $7 million</p>
<p><strong>Contractor:</strong> Structures, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Replaces the 80th Avenue bridge over US 36, which was originally constructed in 1951 and is one of Colorado’s structurally deficient bridges. When complete, the bridge will be wider to accommodate an additional left turn lane from 80th Avenue to Oakwood Drive and a wider sidewalk. The project also realigns 80th Avenue to the east to improve sight distance, access and traffic flow. The improvements will accommodate the future widening of US 36 as determined through the US 36 Environmental Impact Statement.</p>
<p><strong>Work Hours:</strong><br />
<em>US 36:</em> Single lane closures Sunday through Thursday from 10 p.m. to 5:30 a.m. There will be occasional full closures of US 36 for girder installation, bridge deck panel installation and bridge deck concrete pours.<br />
<em>80th Avenue:</em> 80th Avenue will be closed for the duration of the project and a detour route will be in place which takes motorists to either 92nd Avenue on the north or 72nd Avenue on the south.</p>
<p><strong>Duration:</strong> May 2010 through May 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4679" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-I-76.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-I-76-570x427.jpg" alt="SEMA Construction crews are nearing completion on new I-76 bridges over the South Platte River and CO 224 in Adams County. CDOT photo." title="CDOT Traffic Watchers I-76" width="570" height="427" class="size-large wp-image-4679" /></a><p class="wp-caption-text">SEMA Construction crews are nearing completion on new I-76 bridges over the South Platte River and CO 224 in Adams County. CDOT photo.</p></div></p>
<p><strong>4. I-76 over State Highway 224 and I-76 over the Union Pacific Railroad</p>
<p>Cost:</strong> $11 million (ARRA project)</p>
<p><strong>Contractor:</strong> SEMA Construction, Inc.</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Replaces the existing I-76 structures over State Highway 224 and the Union Pacific Railroad, which were both originally built in 1967 and are two of Colorado’s structurally deficient bridges. In addition, the project will construct a crash wall for the I-76 structure over the Union Pacific Railroad as well for the State Highway 224 structure over the Union Pacific Railroad. The crash walls protect the bridge supports in case of a train derailment and are needed for the future North Metro FasTracks line. RTD is funding the design and construction of both walls.</p>
<p><em>Update: </em>The bridges are being constructed in three phases as to not disrupt traffic. Currently, crews have completed the westbound and middle portions of the new bridges and are working on the eastbound portion. Girders have been installed for the final portion and crews will pour the bridge deck in late April.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 7 a.m. to 3:30 p.m. with occasional night work.</p>
<p><strong>Duration:</strong> June 2009 through July 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4678" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-CO7.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-CO7-570x405.jpg" alt="The new CO 7 bridge being built by Zak Dirt Inc. over the South Platte River in Brighton is nearly complete. CDOT photo." title="CDOT Traffic Watchers CO7" width="570" height="405" class="size-large wp-image-4678" /></a><p class="wp-caption-text">The new CO 7 bridge being built by Zak Dirt Inc. over the South Platte River in Brighton is nearly complete. CDOT photo.</p></div></p>
<p><strong>5. State Highway 7 over the Platte River</p>
<p>Cost:</strong> $3.6 million</p>
<p><strong>Contractor:</strong> Zak Dirt, Inc.</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Replaces the existing State Highway 7 structure over the Platte River with a new structure and replaces the existing bridge over the McCann Ditch with a new concrete box culvert. The State Highway 7 bridge over Platte River was originally constructed in 1967 and is one of Colorado’s structurally deficient bridges.</p>
<p><em>Update:</em> To date, crews have completed two thirds of the new bridge and will have the final one third complete by the end of April. In May, crews will pave State Highway 7 in asphalt through the construction zone.</p>
<p><strong>Work Hours: </strong>State Highway 7 is in a temporary alignment with traffic shifted to the south, but all lanes are open in each direction. Occasional night work will take place Sunday through Thursday from 9 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> June 2009 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>6. 96th Avenue at I-76</p>
<p>Cost:</strong> $4.1 million (ARRA project)</p>
<p><strong>Contractor:</strong> Castle Rock Construction Co.</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Constructs roundabouts at the on and off-ramps at the interchange of 96th Avenue and I-76 to improve safety and mobility.</p>
<p><em>Update:</em> The majority of the work is now complete, but crews are finishing work in the southeast quadrant of the roundabouts.</p>
<p><strong>Work Hours:</strong> Single-lane alternating traffic on 96th Avenue Monday through Friday from 7 a.m. to 5:30 p.m. The ramp from eastbound I-76 to 96th Avenue is closed as well as the southeast service road.</p>
<p><strong>Duration:</strong> May 2009 through April 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>7. US 6 over Lakewood Gulch</p>
<p>Quebec Street over Sand Creek</p>
<p>I-70 over I-25</p>
<p>Cost:</strong> $1.1 million</p>
<p><strong>Contractor:</strong> Hamon Contractors, Inc.</p>
<p><strong>Resident Engineer:</strong> Yet to be determined</p>
<p><strong>Work:</strong> Repairs bridges at three locations in the Denver metro area. The work includes cleaning and repairing the culvert at US 6 over Lakewood Gulch; removing deteriorating concrete and patching at Quebec Street over Sand Creek; and replacing expansion joints on I-70 over I-25.</p>
<p><em>Update:</em> The work on US 6 over Lakewood Gulch and Quebec Street over Sand Creek is complete. Crews will begin repairs at I-70 over I-25 in May once the expansion joints have been fabricated.</p>
<p><strong>Work Hours:</strong> Single lane closures from 7 p.m. to 5:30 a.m., Sunday through Thursday.</p>
<p><strong>Duration:</strong> February 2010 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>8. Colorado Boulevard (State Highway 2) &#8211; 62nd Avenue to Quebec Street</p>
<p>Cost:</strong> $3.2 million (ARRA project)</p>
<p><strong>Contractor:</strong> LaFarge North America, Inc.</p>
<p><strong>Resident Engineer:</strong> Bill McDonnell</p>
<p><strong>Work:</strong> Resurfaces 2.4 miles of Colorado Boulevard in asphalt and upgrades traffic signals.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 7 a.m. to 4 p.m.</p>
<p><strong>Duration:</strong> May 2010 through September 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>9. US 85 at 144th Avenue</p>
<p>Cost:</strong> $800,000 (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Bill McDonnell</p>
<p><strong>Work:</strong> Constructs raised traffic islands on 144th Avenue to prohibit traffic in both directions of 144th Avenue from making left turns onto US 85 and also from crossing over US 85. Improvements will also be made to the left turn lanes on US 85.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 7 a.m. to 4 p.m. with occasional night work.</p>
<p><strong>Duration:</strong> May 2010 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>10. State Highway 128 &#8211; McCaslin Boulevard to Eldorado Boulevard</p>
<p>Cost:</strong> $1.4 (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Bill McDonnell</p>
<p><strong>Work:</strong> Rotomills and resurfaces approximately one mile of SH 128 in asphalt</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 9 a.m. to 4 p.m. with occasional night work.</p>
<p><strong>Duration:</strong> August 2010 through September 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>Central Area (Central Program Engineer Jim Bemelen)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
11. I-70 at Ward Road</p>
<p>Cost:</strong> $8.5 million</p>
<p><strong>Contractor: </strong>Asphalt Paving, Co.</p>
<p><strong>Resident Engineer:</strong> Ed Martinez</p>
<p><strong>Work:</strong> Reconstructs the eastbound I-70 exit ramps at 44th Avenue/Ward Road by moving the ramps east a quarter of a mile from their current location in order to increase merge distance. The north side of 44th Avenue will also be widened to accommodate two left turn lanes from eastbound 44th Avenue to I-70 as well as one full continuous merge lane on 44th Avenue between the I-70 off-ramp and Ward Road. Following the completion of interchange work, I-70 between Colfax Avenue and Kipling Street will be rotomilled and paved in asphalt. </p>
<p><strong>Work Hours:</strong><br />
<em>I-70:</em> Single lane closures Monday through Friday from 9 a.m. to 2 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m with double lane closures from 10 p.m. to 5:30 a.m.<br />
<em>44th Avenue:</em> Lane closures Monday through Friday from 7 a.m. to 9 p.m. At least two left turn lanes from 44th Avenue to eastbound I-70 must remain open at all times as well as at least one lane of eastbound and westbound 44th Avenue.</p>
<p><strong>Duration: </strong>January 2010 through June 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>12. I-70 &#8211; Colorado Boulevard to Monaco Street</p>
<p>Cost:</strong> $5 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Ed Martinez</p>
<p><strong>Work:</strong> Replaces concrete barrier along I-70, constructs a new crash wall on Colorado Boulevard under I-70 and installs several new permanent sign structures.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 7 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 4 a.m.</p>
<p><strong>Duration:</strong> June 2010 through October 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>13. I-70 &#8211; Brighton Boulevard (State Highway 265) to Colorado Boulevard (State Highway 2)</p>
<p>Cost:</strong> $21.7 million</p>
<p><strong>Contractor:</strong> American Civil Constructors, Inc.</p>
<p><strong>Resident Engineer:</strong> Tony Stewart</p>
<p><strong>Work:</strong> Repairs or replaces 60 expansion joints on the I-70 viaduct, which is over 40 years old. The project also reconstructs the median to improve drainage and replaces the bridge rail. In all, 64 expansion joints will be repaired or replaced on the viaduct between two projects. The first project, which was completed in 2006, repaired or replaced four expansion joints. This work will help extend the life of this aging structure, which was originally constructed in 1964.</p>
<p><strong>Update:</strong> To date, crews have completed the majority of the expansion joint work between Brighton Boulevard and Vasquez Boulevard and have just started work between Vasquez Boulevard and Colorado Boulevard.</p>
<p><strong>Work hours:</strong><br />
<em>I-70:</em> Single lane closures Sunday through Saturday from 8 p.m. to 5:30 a.m. with double lane closures from 10 p.m. to 5:30 a.m.<br />
<em>46th Avenue:</em> Various segments of eastbound or westbound 46th Avenue will be closed based on the location of the work on I-70.</p>
<p><strong>Duration:</strong> September 2008 through May 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>14. Colorado Boulevard (State Highway 2) &#8211; Alameda Avenue to Martin Luther King Boulevard</p>
<p>Cost:</strong> $3.8 million</p>
<p><strong>Contractor:</strong> LaFarge West, Inc.</p>
<p><strong>Resident Engineer:</strong> Tony Stewart</p>
<p><strong>Work:</strong> Resurfaces approximately 3.5 miles of Colorado Boulevard in asphalt, reconstructs the median and curb ramps. The traffic signals will be upgraded and turn lanes will be improved at the Colorado Boulevard/Colfax Avenue; Colorado Boulevard/17th Avenue and Colorado Boulevard/Montview Boulevard intersections.</p>
<p><strong>Work hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 9 p.m. to 5 a.m.</p>
<p><strong>Duration:</strong> May 2010 through October 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>15. I-70 at Central Park Boulevard</p>
<p>Cost:</strong> $47.2 million (ARRA project)</p>
<p><strong>Contractor:</strong> SEMA Construction, Inc.</p>
<p><strong>Resident Engineer: </strong>Tony Stewart</p>
<p><strong>Work:</strong> Constructs a full interchange at I-70 and Central Park Boulevard which is between Havana Street and Quebec Street. The project will construct all ramps and structures for eastbound and westbound I-70 and for Central Park Boulevard. I-70 between Sand Creek and Havana Street will also be paved in asphalt. This project is being funded by the City and County of Denver with CDOT oversight.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 9 p.m. to 5:30 a.m. with double lane closures from 11 p.m. to 5:30 a.m. Occasional weekend work is possible.</p>
<p><strong>Duration:</strong> June 2010 through Spring 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>16. US 287 from 10th Avenue to Baseline Road (State Highway 7)</p>
<p>Cost:</strong> $5.9 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Randy Furst </p>
<p><strong>Work:</strong> Replaces approximately 230 concrete slabs, rotomills and paves two bridges on US 287 and conducts erosion control work on the east side of US 287.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m.</p>
<p><strong>Duration:</strong> May 2010 through December 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>17. Federal Boulevard (US 287) at 120th Avenue (State Highway 128)<br />
Sheridan Boulevard (State Highway 95) &#8211; 52nd Avenue to 56th Avenue</p>
<p>Cost:</strong> $664,000</p>
<p><strong>Contractor:</strong> K.E.C.I Colorado, Inc.</p>
<p><strong>Resident Engineer:</strong> Randy Furst</p>
<p><strong>Work:</strong> Upgrades the traffic signals at both locations to include mast arm poles and LED lights. A raised median will also be installed on Sheridan Avenue between 52nd Avenue and 56th Avenue to improve safety</p>
<p><strong>Work Hours: </strong>Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m.</p>
<p><strong>Duration:</strong> March 2010 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>South Area (South Program Engineer Paul Jesaitis)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4677" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Arapahoe-I-25.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Arapahoe-I-25-570x412.jpg" alt="Structures Inc. has excavation underway for the widening of Arapahoe Road under I-25. CDOT photo." title="CDOT Traffic Watchers Arapahoe I-25" width="570" height="412" class="size-large wp-image-4677" /></a><p class="wp-caption-text">Structures Inc. has excavation underway for the widening of Arapahoe Road under I-25. CDOT photo.</p></div></p>
<p>18. Arapahoe Road (State Highway 88) &#8211; Yosemite Street to Boston/Clinton Street</p>
<p>Cost:</strong> $2.4 million</p>
<p><strong>Contractor:</strong> Structures, Inc.</p>
<p><strong>Resident Engineer:</strong> Abe Lavassani</p>
<p><strong>Work:</strong> Adds an additional through lane in each direction by placing the new lanes where the existing on-ramp lanes exist. This means that the third lane will be separated from the existing through lanes by the pier columns. In addition, a turn lane on westbound Arapahoe Road between the southbound I-25 off-ramp and Yosemite Street will be added and the center median will be modified to accommodate the new configuration.</p>
<p><strong>Update:</strong> The majority of the work has been completed, but median work and paving remain. Over the next couple of months, crews will remove the medians on eastbound and westbound Arapahoe Road, pave the additional lane from southbound I-25 to westbound Arapahoe Road, complete asphalt paving through the construction zone and complete landscaping.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 9 a.m. to 3:30 p.m. and Sunday through Thursday from 7:30 p.m. to 5:30 a.m. There will be occasional weekend work.</p>
<p><strong>Duration:</strong> September 2009 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>19. Southbound I-25 to I-225<br />
Parker Road (State Highway 83) to Southbound I-225</p>
<p>Cost:</strong> $1.5 million</p>
<p><strong>Contractor:</strong> ABCO Construction, Inc.</p>
<p><strong>Resident Engineer:</strong> Abe Lavassani</p>
<p><strong>Work: </strong>Installs an anti-icing treatment on the ramps from southbound I-25 to northbound I-225 and northbound Parker Road to southbound I-225 to improve traction. Automatic anti-icing systems will also be installed on the ramp from southbound I-25 to northbound I-225 and from southbound I-225 to southbound I-25.</p>
<p><strong>Update: </strong>The traction material has been installed on the ramp from southbound I-25 to northbound I-225 and on one lane of the ramp from northbound Parker Road to southbound I-225. Crews will likely return in May to complete the paving on the second lane of the northbound Parker Road to southbound I-225 ramp. Crews will be wrapping up the installation of the two anti-icing systems in the next couple of weeks.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. and from 9 p.m. Friday to 5 a.m. on Monday.</p>
<p><strong>Duration:</strong> October 2009 through June 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>20. Parker Road (State Highway 83) at Arapahoe Road (State Highway 88)</p>
<p>Cost:</strong> $30 million (estimate)</p>
<p><strong>Contractor: </strong>Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Abe Lavassani</p>
<p><strong>Work: </strong>The final phase of this interchange improvement project constructs a grade-separated interchange and the corresponding ramps and improves drainage. When complete, Parker Road will run over Arapahoe Road and the traffic signal will be removed for free-flowing traffic at the interchange.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 9 a.m. to 3:30 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m. Throughout construction, Parker Road or Arapahoe Road may be placed in a temporary alignment.</p>
<p>Duration: May 2010 through December 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>21. I-225 at Colfax Avenue (US 40)- Phase I</p>
<p>Cost:</strong> $1.4 million (ARRA project)</p>
<p><strong>Contractor:</strong> Concrete Works of Colorado</p>
<p><strong>Resident Engineer:</strong> Rick Erjavec</p>
<p><strong>Work: </strong>This is the first phase of an interchange improvement project. This phase will reconstruct the southbound I-225 off-ramp to Colfax Avenue as well as the northbound I-225 on-ramp from Colfax Avenue. Drainage improvements will also be made. The City of Aurora will construct this phase with CDOT oversight.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. or Sunday through Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> November 2009 through April 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>22. I-225 at Colfax Avenue (US 40)- Phase 2</p>
<p>Cost:</strong> $17.9 million (ARRA project)</p>
<p><strong>Contractor:</strong> Hamon Contractors, Inc.</p>
<p><strong>Resident Engineer:</strong> Rick Erjavec</p>
<p><strong>Work: </strong>The second phase of the interchange improvement project will construct the southbound off-ramp to 17th Avenue and Colfax Avenue along with the southern portion of 17th Avenue to serve inbound traffic. The City of Aurora will construct this phase with CDOT oversight.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. or Sunday through Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> April 2010 through December 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>23. I-225 &#8211; 2nd Avenue to Mississippi Avenue</p>
<p>Cost:</strong> $33 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Rick Erjavec</p>
<p><strong>Work:</strong> Widens I-225 between 2nd Avenue and Mississippi Avenue to accommodate three lanes in each direction with an additional auxiliary lane. I-225 from north of Colfax Avenue to 2nd Avenue will be restriped to also accommodate three lanes in each direction. A new 8-10 foot concrete noise wall will be constructed near Mississippi Avenue to replace the deteriorating wooden fence and a new 8-10 foot noise wall will be constructed near Potomac Circle.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. or Sunday through Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> June 2010 through August 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4676" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-C-470.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-C-470-570x392.jpg" alt="Castle Rock Construction crews continue to work on rehabilitation of the C-470 roadway. CDOT photo." title="CDOT Traffic Watchers C-470" width="570" height="392" class="size-large wp-image-4676" /></a><p class="wp-caption-text">Castle Rock Construction crews continue to work on rehabilitation of the C-470 roadway. CDOT photo.</p></div></p>
<p><strong>24. C-470 &#8211; I-25 to Santa Fe Drive (US 85)<br />
C-470 Bike Trail &#8211; I-25 to I-70</p>
<p>Cost:</strong> $32 million (ARRA project)</p>
<p><strong>Contractor:</strong> Castle Rock Construction Co.</p>
<p><strong>Resident Engineer:</strong> Ron Buck</p>
<p><strong>Work:</strong> Repairs or replaces concrete slabs along nine miles of C-470 and resurfaces C-470 in asphalt. Rehabilitates and replaces concrete slabs on the C-470 bicycle/pedestrian trail.</p>
<p><strong>Update: </strong>To date, the concrete repairs are complete on westbound C-470 and the majority of eastbound C-470. Crews will complete the concrete work on eastbound C-470 in the coming months and then begin asphalt paving on both eastbound and westbound C-470. Bike path work is also still underway.</p>
<p><strong>Work Hours: </strong>The majority of the roadway work on C-470 will take place from 8 p.m. Friday to 5 a.m. Monday each weekend. Single lane closures are also possible Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m. Work on the bike path will take place Monday through Friday from 8:30 a.m. to 5 p.m.</p>
<p><strong>Duration:</strong> July 2009 through September 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4671" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Alameda-Bridge.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Alameda-Bridge-570x394.jpg" alt="The 1958 Valley Highway bridge over Alameda Avenue -- and the flash flooding that often occurs underneath it -- will be things of the past with a replacement project now getting underway by Jalisco International. CDOT photo." title="CDOT Traffic Watchers Alameda Bridge" width="570" height="394" class="size-large wp-image-4671" /></a><p class="wp-caption-text">The 1958 Valley Highway bridge over Alameda Avenue -- and the flash flooding that often occurs underneath it -- will be things of the past with a replacement project now getting underway by Jalisco International. CDOT photo.</p></div></p>
<p><strong>25. I-25 at Alameda Avenue</p>
<p>Cost:</strong> $36.9 million (ARRA project)</p>
<p><strong>Contractor:</strong> Jalisco International, Inc.</p>
<p><strong>Resident Engineer:</strong> Ron Buck</p>
<p><strong>Work:</strong> Replaces the Alameda Avenue bridge over I-25 with one that is wider to accommodate an additional lane in each direction. Minor improvements will also be made to I-25 under Alameda Avenue and drainage will be improved. This work is part of a larger project that will eventually improve I-25 as determined in the I-25 Valley Highway Environmental Impact Statement.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5 a.m. with occasional weekend work.</p>
<p><strong>Duration:</strong> April 2010 through September 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>26. Santa Fe Drive (US 85) at C-470</p>
<p>Cost:</strong> $32 million (ARRA project)</p>
<p><strong>Contractor</strong>: Edward Kraemer &#038; Sons, Inc.</p>
<p><strong>Resident Engineer:</strong> Ron Buck</p>
<p><strong>Work: </strong>Constructs a flyover ramp from southbound Santa Fe Drive to eastbound C-470 to improve safety and mobility.</p>
<p><strong>Work Hours:</strong><br />
<em>Santa Fe Drive: </em>Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 8 p.m. to 5:30 a.m.<br />
<em>C-470:</em> Single lane closures Sunday through Thursday from 8 p.m. to 5:30 a.m. Full closures of C-470 will also be required for girder installation, bridge deck panel installation and concrete deck pour.</p>
<p><strong>Duration:</strong> June 2010 through January 2012<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>27. I-25 &#8211; 6th Avenue to 23rd Avenue</p>
<p>Cost:</strong> $4.3 million (ARRA project)</p>
<p><strong>Contractor:</strong> Brannan Sand and Gravel Co.</p>
<p><strong>Resident Engineer:</strong> Tony Gross</p>
<p><strong>Work:</strong> Rotomills and resurfaces approximately three miles of I-25 in asphalt.</p>
<p><strong>Update: </strong>The majority of work is complete, but crews need to complete some smoothness grinding and some erosion control work.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5 a.m.</p>
<p><strong>Duration:</strong> June 2009 through April 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<div id="attachment_4674" class="wp-caption alignright" style="width: 310px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Hampden-Federal.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/04/CDOT-Traffic-Watchers-Hampden-Federal-300x223.jpg" alt="Concrete Express crews excavate for new bridge pier footings at the Hampden Avenue bridge over Federal Boulevard. CDOT photo." title="CDOT Traffic Watchers Hampden Federal" width="300" height="223" class="size-medium wp-image-4674" /></a><p class="wp-caption-text">Concrete Express crews excavate for new bridge pier footings at the Hampden Avenue bridge over Federal Boulevard. CDOT photo.</p></div></p>
<p><strong>28. Hampden Avenue (US 285) -Kipling Street to Federal Boulevard</p>
<p>Cost:</strong> $40.1 million</p>
<p><strong>Contractor: </strong>Concrete Express, Inc.</p>
<p><strong>Resident Engineer:</strong> Tony Gross</p>
<p><strong>Work: </strong>Replaces the Wadsworth Boulevard (State Highway 121), Pierce Street and Federal Boulevard (State Highway 88) bridges over Hampden Avenue and reconstructs Hampden Avenue between Wadsworth Boulevard and Federal Boulevard.</p>
<p><strong>Update:</strong> Construction started near Federal Boulevard with crews realigning Hampden Avenue to accommodate reconstruction in the median. In late April/early May, construction will begin to replace the Hampden Avenue bridge over Federal Boulevard. Construction will continue to move west as work progresses.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through Thursday from 7 p.m. to 5:30 a.m. Full closures of Hampden Avenue will also be required for girder installation, bridge deck panel installation and concrete deck pour.</p>
<p><strong>Duration:</strong> January 2010 through June 2011</p>
<p><strong>Region 6 Traffic Engineering Projects (Traffic Engineer Steve Hersey)<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
29. State Highway 7 at York Street</p>
<p>Cost:</strong> $750,000 (estimate)</p>
<p><strong>Contractor: </strong>Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Jake Koenig</p>
<p><strong>Work:</strong> Adds an auxiliary lane on State Highway 7 from 168th Avenue to York Street and installs a new traffic signal at the SH 7/York Street intersection.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m.</p>
<p><strong>Duration:</strong> June 2010 through November 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>30. C-470 &#8211; Quebec Street to I-25<br />
C-470 &#8211; Morrison Road to Wadsworth Boulevard<br />
Santa Fe Drive (US 85)- Aspen Grove Way to Ridge Road</p>
<p>Cost:</strong> $3.3 million (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Leela Rajasekar</p>
<p><strong>Work:</strong> Installs median cable guardrail in two locations along C-470 to help prevent crossover accidents. Concrete median barrier will also be installed on Santa Fe Drive.</p>
<p><strong>Work Hours:</strong> Single lane closures Sunday through Thursday from 8 p.m. to 5 a.m.</p>
<p><strong>Duration:</strong> June 2010 through February 2011<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>31. US 6 &#8211; Heritage Road to 19th Avenue</p>
<p>Cost:</strong> $500,000 (estimate)</p>
<p><strong>Contractor: </strong>Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Leela Rajasekar</p>
<p><strong>Work:</strong> Installs a wildlife fence along US 6 to help prevent wildlife/vehicle collisions.</p>
<p><strong>Work Hours:</strong> Single lane closures Monday through Friday from 8:30 a.m. to 3:30 p.m. and Sunday through<br />
Thursday from 7 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> August 2010 through November 2010<br />
&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;&#8212;<br />
<strong>32. Parker Road (State Highway 83) &#8211; Belleview Avenue to Hampden Avenue</p>
<p>Cost:</strong> $180,000 (estimate)</p>
<p><strong>Contractor:</strong> Yet to be determined</p>
<p><strong>Resident Engineer:</strong> Alazar Tesfaye</p>
<p><strong>Work: </strong>Restripes Parker Road to accommodate a third through lane in each direction.</p>
<p><strong>Work Hours:</strong> Sunday through Thursday from 8 p.m. to 5:30 a.m.</p>
<p><strong>Duration:</strong> May 2010 through June 2010</p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/04/09/cdot-traffic-watchers-projects/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>RTD plans to make bridge move a spectator event</title>
		<link>http://www.inside-lane.com/2010/03/31/rtd-plans-to-make-bridge-move-a-spectator-event/</link>
		<comments>http://www.inside-lane.com/2010/03/31/rtd-plans-to-make-bridge-move-a-spectator-event/#comments</comments>
		<pubDate>Thu, 01 Apr 2010 04:31:50 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Transit]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[FasTracks]]></category>
		<category><![CDATA[Regional Transportation District]]></category>
		<category><![CDATA[RTD]]></category>
		<category><![CDATA[Sixth Avenue]]></category>
		<category><![CDATA[Sixth Avenue Freeway]]></category>
		<category><![CDATA[West Corridor]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4620</guid>
		<description><![CDATA[<img src="http://www.inside-lane.com/wp-content/uploads/2010/03/New-bridge.jpg" alt="The new light rail bridge that will span Sixth Avenue is being assembled on the Denver Federal Center grounds. Lakewood Edge photo." title="New-bridge" width="380" class="size-full wp-image-4621" />

When FasTracks rolls out the bridge that will span West 6th Avenue on the west side of the Federal Center, it will do so literally, closing down a stretch of the heavily traveled highway for two days. 
And the Regional Transportation District plans to make the snail’s pace placement of the bridge a spectator event.]]></description>
			<content:encoded><![CDATA[<p><div id="attachment_4621" class="wp-caption alignleft" style="width: 580px"><a href="http://www.inside-lane.com/wp-content/uploads/2010/03/New-bridge.jpg"><img src="http://www.inside-lane.com/wp-content/uploads/2010/03/New-bridge.jpg" alt="The new light rail bridge that will span Sixth Avenue is being assembled on the Denver Federal Center grounds. Lakewood Edge photo." title="New-bridge" width="570" class="size-full wp-image-4621" /></a><p class="wp-caption-text">The new light rail bridge that will span Sixth Avenue is being assembled on the Denver Federal Center grounds. Lakewood Edge photo.</p></div><em>By Charley Able<br />
<a href="http://lakewoodedge.com/">Lakewood Edge</a></em></p>
<p>When <a href="http://www.rtd-fastracks.com/main_1">FasTracks </a>rolls out the bridge that will span West 6th Avenue on the west side of the Federal Center, it will do so literally, closing down a stretch of the heavily traveled highway for two days.</p>
<p>And the <a href="http://rtd-denver.com/">Regional Transportation District</a> plans to make the snail’s pace placement of the bridge a spectator event.</p>
<p>The huge span will be wheeled from its fabrication site south of the highway about 9 a.m. Saturday, April 24, and grandstands will be in place so the public can watch the slow-motion haul first-hand. The plans for the rollout are contained in a memo to RTD’s Board of Directors obtained by the Edge.</p>
<p>The transportation agency plans to make a major production of the move and will set up a public viewing area at the Office Liquidators lot on the north side of the 6th Avenue Frontage Road at Quail Street. The plans call for bleacher seating and the agency will distribute maps to the public about a week before the bridge starts its move.</p>
<p>The bridge will move somewhat faster, about 25 feet per hour, a journey that will take an estimated 30 hours to reach its destination, according to RTD. It will be moved via two eight-axle, 35-foot transport platforms.</p>
<p>But the traffic impacts of the roll-out are no joking matter: All lanes of West 6th Avenue will shut down between Kipling Street and the Simms/Union exits for the entire weekend, from Friday evening until Monday morning, according to the memo. Major congestion can be expected along the detours – Kipling north to West Colfax Avenue then west to Simms and south back to West 6th for westbound traffic; and Union Boulevard south to West Alameda Avenue, then Kipling north to the highway for eastbound traffic.</p>
<p>Folks headed to or from the mountains and foothills can take Interstate 70 westbound to avoid the detours.</p>
<p>The bridge “launch”, as the memo calls it, might be a slow haul, but the sight should be impressive. The bridge is 286 feet long, 43 feet wide and is 65 feet tall from crown to base. Its structural steel components weigh a total of 1.2 million pounds. The high-strength steel is “weathered”, turning brown as a “protective oxide coating” forms, eliminating the need for painting according to a fact sheet distributed with the FastTracks memo.</p>
<p>The bridge is a “clear span” design with no center pier in the freeway median to hold up the span. Instead 44 cables strung from the arch to the base provide support with an estimated breaking strength of 688,000 pounds. There are 1,950 feet of 23/8-inch cable criss-crossing the bridge.</p>
<p>The clear-span design will be wide enough from side pier to side pier to allow future widening of the freeway, the Simms-Union interchange ramps that pass beneath the bridge and the frontage road on the north side of West 6th Avenue.</p>
<p><a href="http://lakewoodedge.cmo"><em>Read more Lakewood news at Lakewood Edge.</em></a></p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/31/rtd-plans-to-make-bridge-move-a-spectator-event/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CDOT: Pueblo bridge demolition will close Arkansas River Trail temporarily</title>
		<link>http://www.inside-lane.com/2010/03/30/cdot-pueblo-bridge-demolition-will-close-arkansas-river-trail-temporarily/</link>
		<comments>http://www.inside-lane.com/2010/03/30/cdot-pueblo-bridge-demolition-will-close-arkansas-river-trail-temporarily/#comments</comments>
		<pubDate>Wed, 31 Mar 2010 03:21:38 +0000</pubDate>
		<dc:creator>Kevin Flynn</dc:creator>
				<category><![CDATA[Breaking News]]></category>
		<category><![CDATA[bridges]]></category>
		<category><![CDATA[CDOT]]></category>
		<category><![CDATA[Colorado Department of Transportation]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[Pueblo]]></category>

		<guid isPermaLink="false">http://www.inside-lane.com/?p=4611</guid>
		<description><![CDATA[<strong>CDOT Media Advisory

4th Street Bridge Trail closure begins this week</strong>

March 29, 2010 - ADVISORY - Southeastern Colorado/CDOT Region 2 - PUEBLO - The Colorado Department of Transportation is closing the Arkansas River Trail, under the 4th Street Bridge (State Highway 96), beginning on Thursday, April 1.

Safety considerations will not allow the path to remain open as demolition work begins on the old bridge structure.

The trail will be closed around-the-clock, including weekends.  A signed detour will be place while the trail is closed.  It is scheduled to reopen on June 1, 2010. ]]></description>
			<content:encoded><![CDATA[<p><strong>CDOT Media Advisory</p>
<p>4th Street Bridge Trail closure begins this week</strong></p>
<p>March 29, 2010 &#8211; ADVISORY &#8211; Southeastern Colorado/CDOT Region 2 &#8211; PUEBLO &#8211; The Colorado Department of Transportation is closing the Arkansas River Trail, under the 4th Street Bridge (State Highway 96), beginning on Thursday, April 1.</p>
<p>Safety considerations will not allow the path to remain open as demolition work begins on the old bridge structure.</p>
<p>The trail will be closed around-the-clock, including weekends.  A signed detour will be place while the trail is closed.  It is scheduled to reopen on June 1, 2010. </p>
]]></content:encoded>
			<wfw:commentRss>http://www.inside-lane.com/2010/03/30/cdot-pueblo-bridge-demolition-will-close-arkansas-river-trail-temporarily/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

